Overview
Technology: combined cycle; fuel: natural gas.
Ownership: F3 Holding Co (parent company: Abu Dhabi Developmental Holding Company PJSC; Marubeni Corp).
Why it matters
- The 6th-largest oil- and gas-fired power station in United Arab Emirates by capacity (of 32 operating oil & gas facilities tracked).
- Provides about 5.2% of United Arab Emirates's operating oil & gas capacity and roughly 4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 8.4 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United Arab Emirates
United Arab Emirates has 45.9 GW of operating oil & gas capacity across 32 plants in the Global Energy Monitor dataset — 77% of the country's total operating power capacity of 59.5 GW.
The oil & gas pipeline in United Arab Emirates includes 1.38 GW under construction and 7.30 GW at earlier planning stages.
Other major oil & gas plants in United Arab Emirates include Emirates Aluminum Smelter Complex power station (3.73 GW), Emirates Global Aluminum Smelter power station (2.99 GW) and Jebel Ali M Power and Desalination Station (2.88 GW).
See the full list: Gas & oil power plants in United Arab Emirates →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 2.40 GW | combined cycle | 2025 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Fujairah F3 Integrated Water and power plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Fujairah F3 Integrated Water and power plant is located in Fujairah, United Arab Emirates, at approximately 25.3019, 56.3704. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Fujairah F3 Integrated Water and power plant is owned by F3 Holding Co. The ultimate parent company is Abu Dhabi Developmental Holding Company PJSC; Marubeni Corp. Across the dataset, Abu Dhabi Developmental Holding Company PJSC is linked to 7 power plants in 3 countries, with 2.42 GW of operating capacity.
Frequently asked questions
What is the capacity of Fujairah F3 Integrated Water and power plant?
Fujairah F3 Integrated Water and power plant has a capacity of 2.40 GW according to the latest Global Energy Monitor data.
What type of facility is Fujairah F3 Integrated Water and power plant?
Fujairah F3 Integrated Water and power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Fujairah F3 Integrated Water and power plant?
Fujairah F3 Integrated Water and power plant is owned by F3 Holding Co. The ultimate parent company is Abu Dhabi Developmental Holding Company PJSC; Marubeni Corp.
Where is Fujairah F3 Integrated Water and power plant located?
It is located in Fujairah, United Arab Emirates. Approximate coordinates: 25.3019, 56.3704.
Is Fujairah F3 Integrated Water and power plant operational?
According to the latest data, Fujairah F3 Integrated Water and power plant is in operation. Operating means the facility is built and in commercial service.
When did Fujairah F3 Integrated Water and power plant start operating?
Start year: 2025. Current status: Operating.
How much electricity does Fujairah F3 Integrated Water and power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Fujairah F3 Integrated Water and power plant would produce about 8.4 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Fujairah F3 Integrated Water and power plant compared with other facilities in United Arab Emirates?
Fujairah F3 Integrated Water and power plant ranks #6 by capacity among 32 comparable oil & gas facilities tracked in United Arab Emirates.