Overview
Global Energy Monitor tracks 2 units or phases at this site (under construction 3.60 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Korea Electric Power Corp; ACWA Power Co (parent company: ACWA Power Co; Korea Electric Power Corp).
2 further units or phases are scheduled to come online in 2028.
Why it matters
- The 8th-largest oil- and gas-fired power station in Saudi Arabia by capacity (of 104 operating, under-construction and planned oil & gas facilities tracked).
- If completed, it would add 3.60 GW to Saudi Arabia's oil & gas fleet — equivalent to 3.6% of today's operating oil & gas capacity.
- Ranks #48 worldwide among oil & gas facilities of the same status group by capacity.
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Saudi Arabia
Saudi Arabia has 100.6 GW of operating oil & gas capacity across 97 plants in the Global Energy Monitor dataset — 89% of the country's total operating power capacity of 112.6 GW.
The oil & gas pipeline in Saudi Arabia includes 14.9 GW under construction and 6.00 GW at earlier planning stages.
Other major oil & gas plants in Saudi Arabia include Rabigh 1 power plant (4.48 GW), Ghazlan power plant (4.26 GW) and Qurayyah CC power plant (4.10 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1-رماح 1 | 1.80 GW | Construction | combined cycle | 2028 | |
| 2-رماح 2 | 1.80 GW | Construction | combined cycle | 2028 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Rumah IPP Power Plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Rumah IPP Power Plant is located in Riyadh, Saudi Arabia, at approximately 25.5667, 47.1626. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Rumah IPP Power Plant is owned by Korea Electric Power Corp; ACWA Power Co. The ultimate parent company is ACWA Power Co; Korea Electric Power Corp. Across the dataset, ACWA Power Co is linked to 75 power plants in 16 countries, with 40.3 GW of operating capacity.
Frequently asked questions
What is the capacity of Rumah IPP Power Plant?
Rumah IPP Power Plant has a capacity of 3.60 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Rumah IPP Power Plant?
Rumah IPP Power Plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Rumah IPP Power Plant?
Rumah IPP Power Plant is owned by Korea Electric Power Corp; ACWA Power Co. The ultimate parent company is ACWA Power Co; Korea Electric Power Corp.
Where is Rumah IPP Power Plant located?
It is located in Riyadh, Saudi Arabia. Approximate coordinates: 25.5667, 47.1626.
Is Rumah IPP Power Plant operational?
According to the latest data, Rumah IPP Power Plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Rumah IPP Power Plant expected to start?
Start year: 2028. Current status: Construction. 2 further units or phases are scheduled to come online in 2028.
How big is Rumah IPP Power Plant compared with other facilities in Saudi Arabia?
Rumah IPP Power Plant ranks #8 by capacity among 104 comparable oil & gas facilities tracked in Saudi Arabia.