Al-Qassim IPP power plant is a 3.60 GW oil- and gas-fired power station located in Qasim, Saudi Arabia. The facility is currently under construction, with a targeted start date of 2027.

3.60 GWCapacity (all phases)
ConstructionStatus
2027Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (under construction 3.60 GW).

Technology: combined cycle; fuel: natural gas.

Ownership: Saudi Power Procurement Co.

2 further units or phases are scheduled to come online in 2027.

Why it matters

  • The 8th-largest oil- and gas-fired power station in Saudi Arabia by capacity (of 104 operating, under-construction and planned oil & gas facilities tracked).
  • If completed, it would add 3.60 GW to Saudi Arabia's oil & gas fleet — equivalent to 3.6% of today's operating oil & gas capacity.
  • Ranks #48 worldwide among oil & gas facilities of the same status group by capacity.

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Saudi Arabia

Saudi Arabia has 100.6 GW of operating oil & gas capacity across 97 plants in the Global Energy Monitor dataset — 89% of the country's total operating power capacity of 112.6 GW.

The oil & gas pipeline in Saudi Arabia includes 14.9 GW under construction and 6.00 GW at earlier planning stages.

Other major oil & gas plants in Saudi Arabia include Rabigh 1 power plant (4.48 GW), Ghazlan power plant (4.26 GW) and Qurayyah CC power plant (4.10 GW).

See the full list: Gas & oil power plants in Saudi Arabia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1-القصيم 1 1.80 GW Construction combined cycle 2027
2- القصيم 2 1.80 GW Construction combined cycle 2027

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Al-Qassim IPP power plant

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Al-Qassim IPP power plant is located in Qasim, Saudi Arabia, at approximately 25.7969, 42.6208. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Al-Qassim IPP power plant is owned by Saudi Power Procurement Co. Across the dataset, Saudi Power Procurement Co is linked to 7 power plants.

Frequently asked questions

What is the capacity of Al-Qassim IPP power plant?

Al-Qassim IPP power plant has a capacity of 3.60 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Al-Qassim IPP power plant?

Al-Qassim IPP power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Al-Qassim IPP power plant?

Al-Qassim IPP power plant is owned by Saudi Power Procurement Co.

Where is Al-Qassim IPP power plant located?

It is located in Qasim, Saudi Arabia. Approximate coordinates: 25.7969, 42.6208.

Is Al-Qassim IPP power plant operational?

According to the latest data, Al-Qassim IPP power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Al-Qassim IPP power plant expected to start?

Start year: 2027. Current status: Construction. 2 further units or phases are scheduled to come online in 2027.

How big is Al-Qassim IPP power plant compared with other facilities in Saudi Arabia?

Al-Qassim IPP power plant ranks #8 by capacity among 104 comparable oil & gas facilities tracked in Saudi Arabia.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.