Global Energy Monitor tracks 11 units or phases at this site (operating 1.88 GW, planned 1.36 GW, retired 225 MW).
Technology: combined cycle, subcritical; fuel: wood & other biomass (solids), natural gas, coal: bituminous.
Ownership: ENEA SA.
Its 8 operating units were commissioned between 1979 and 1983. 2 further units or phases are scheduled to come online in 2030. 1 units have already been retired (2011).
Why it matters
- The largest oil- and gas-fired power station in Poland by capacity, out of 26 operating oil & gas facilities tracked in the country.
- Provides about 20% of Poland's operating oil & gas capacity and roughly 3.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 6.6 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Poland
Poland has 9.28 GW of operating oil & gas capacity across 26 plants in the Global Energy Monitor dataset — 17% of the country's total operating power capacity of 53.3 GW.
The oil & gas pipeline in Poland includes 2.28 GW under construction and 1.66 GW at earlier planning stages.
Other major oil & gas plants in Poland include Dolna Odra power station (1.83 GW), Grudziądz power station (1.12 GW) and Zeran power station (1.08 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 8R, timepoint 2 | 225 MW | 1983 | |||
| CCGT 1 | 680 MW | Announced | combined cycle | 2030 | |
| CCGT 2 | 680 MW | Announced | combined cycle | 2030 | |
| Unit 1 | 225 MW | subcritical | 1979 | ||
| Unit 2 | 242 MW | subcritical | 1979 | ||
| Unit 3 | 242 MW | subcritical | 1979 | ||
| Unit 4 | 242 MW | subcritical | 1979 | ||
| Unit 5 | 225 MW | subcritical | 1982 | ||
| Unit 6 | 242 MW | subcritical | 1982 | ||
| Unit 7 | 239 MW | subcritical | 1983 | ||
| Unit 8, timepoint 1 | 225 MW | Retired | subcritical | 1983 | 2011 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Polaniec power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Polaniec power station is located in Świętokrzyskie, Poland, at approximately 50.4377, 21.3377. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Polaniec power station is owned by ENEA SA. Across the dataset, ENEA SA is linked to 10 power plants with 6.16 GW of operating capacity.
Frequently asked questions
What is the capacity of Polaniec power station?
Polaniec power station has a capacity of 1.88 GW according to the latest Global Energy Monitor data. This figure covers the 11 units or phases listed for the site.
What type of facility is Polaniec power station?
Polaniec power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Polaniec power station?
Polaniec power station is owned by ENEA SA.
Where is Polaniec power station located?
It is located in Świętokrzyskie, Poland. Approximate coordinates: 50.4377, 21.3377.
Is Polaniec power station operational?
According to the latest data, Polaniec power station is in operation. Operating means the facility is built and in commercial service.
When did Polaniec power station start operating?
Start year: 1979. Current status: Operating. Its 8 operating units were commissioned between 1979 and 1983. 2 further units or phases are scheduled to come online in 2030. 1 units have already been retired (2011).
How much electricity does Polaniec power station generate?
Actual output data are not published for every plant. As an indicative estimate, Polaniec power station would produce about 6.6 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Polaniec power station compared with other facilities in Poland?
Polaniec power station ranks #1 by capacity among 26 comparable oil & gas facilities tracked in Poland.