Overview
Global Energy Monitor tracks 14 units or phases at this site (operating 5.03 GW, retired 370 MW).
Technology: subcritical, supercritical; fuel: coal: lignite.
Ownership: PGE Górnictwo i Energetyka Konwencjonalna SA (parent company: PGE Polska Grupa Energetyczna SA).
Its 12 operating units were commissioned between 1983 and 2011. 1 units have already been retired (2019). 12 operating units have a planned retirement date, the earliest in 2030.
Why it matters
- The largest coal-fired power station in Poland by capacity, out of 31 operating coal facilities tracked in the country.
- Provides about 21% of Poland's operating coal capacity and roughly 9.4% of all operating power capacity in the country in the dataset.
- Ranks #15 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 22 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Poland
Poland has 23.6 GW of operating coal capacity across 31 plants in the Global Energy Monitor dataset — 44% of the country's total operating power capacity of 53.3 GW.
The coal pipeline in Poland includes 100 MW under construction.
Other major coal plants in Poland include Kozienice power station (3.99 GW), Opole power station (3.33 GW) and Jaworzno power station (2.45 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase 1 Unit 1 | 370 MW | Retired | subcritical | 1981 | 2019 |
| Phase 1 Unit 2 | 358 MW | subcritical | 1983 | 2030 | |
| Phase 1 Unit 3 | 380 MW | subcritical | 1984 | 2031 | |
| Phase 1 Unit 4 | 380 MW | subcritical | 1984 | 2032 | |
| Phase 1 Unit 5 | 380 MW | subcritical | 1985 | 2032 | |
| Phase 1 Unit 6 | 394 MW | subcritical | 1985 | 2033 | |
| Phase 1 Unit 7 | 390 MW | subcritical | 1985 | 2033 | |
| Phase 1 Unit 8 | 390 MW | subcritical | 1986 | 2034 | |
| Phase 1 Unit 9 | 370 MW | subcritical | 1986 | 2034 | |
| Phase 1 Unit 10 | 370 MW | subcritical | 1987 | 2034 | |
| Phase 1 Unit 11 | 390 MW | subcritical | 1988 | 2035 | |
| Phase 1 Unit 12 | 370 MW | subcritical | 1988 | 2035 | |
| Phase 2 Unit 1 | 858 MW | supercritical | 2011 | 2036 | |
| Phase 2 Unit 2 | 858 MW | Cancelled | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Belchatow power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Belchatow power station is located in Łódzkie, Poland, at approximately 51.2664, 19.3306. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Belchatow power station is owned by PGE Górnictwo i Energetyka Konwencjonalna SA. The ultimate parent company is PGE Polska Grupa Energetyczna SA. Across the dataset, PGE Polska Grupa Energetyczna SA is linked to 21 power plants with 15.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Belchatow power station?
Belchatow power station has a capacity of 5.03 GW according to the latest Global Energy Monitor data. This figure covers the 14 units or phases listed for the site.
What type of facility is Belchatow power station?
Belchatow power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Belchatow power station?
Belchatow power station is owned by PGE Górnictwo i Energetyka Konwencjonalna SA. The ultimate parent company is PGE Polska Grupa Energetyczna SA.
Where is Belchatow power station located?
It is located in Łódzkie, Poland. Approximate coordinates: 51.2664, 19.3306.
Is Belchatow power station operational?
According to the latest data, Belchatow power station is in operation. Operating means the facility is built and in commercial service.
When did Belchatow power station start operating?
Start year: 1983. Current status: Operating. Its 12 operating units were commissioned between 1983 and 2011. 1 units have already been retired (2019). 12 operating units have a planned retirement date, the earliest in 2030.
How much electricity does Belchatow power station generate?
Actual output data are not published for every plant. As an indicative estimate, Belchatow power station would produce about 22 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Belchatow power station compared with other facilities in Poland?
Belchatow power station ranks #1 by capacity among 31 comparable coal facilities tracked in Poland.