Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.50 GW).
Technology: steam turbine, combined cycle; fuel: natural gas, fossil liquids: heavy fuel oil, coal: unknown.
Ownership: Unipro PJSC.
Its 7 operating units were commissioned between 1971 and 2010.
Why it matters
- The 16th-largest oil- and gas-fired power station in Russia by capacity (of 226 operating oil & gas facilities tracked).
- Provides about 1.3% of Russia's operating oil & gas capacity and roughly 0.6% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Russia
Russia has 117.8 GW of operating oil & gas capacity across 226 plants in the Global Energy Monitor dataset — 49% of the country's total operating power capacity of 240.2 GW.
The oil & gas pipeline in Russia includes 3.35 GW under construction and 1.52 GW at earlier planning stages.
Other major oil & gas plants in Russia include Surgut GRES-2 power station (5.74 GW), Kostromskaya GRES power station (3.75 GW) and Perm GRES power station (3.39 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 200 MW | steam turbine | 1971 | ||
| 2 | 200 MW | steam turbine | 1972 | ||
| 3 | 200 MW | steam turbine | 1972 | ||
| 4 | 210 MW | steam turbine | 1977 | ||
| 5 | 210 MW | steam turbine | 1978 | ||
| 6 | 80 MW | steam turbine | 1982 | ||
| CC1 | 400 MW | combined cycle | 2010 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Shatura GRES power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Shatura GRES power station is located in Moscow, Russia, at approximately 55.5794, 39.5605. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Shatura GRES power station is owned by Unipro PJSC. Across the dataset, Unipro PJSC is linked to 5 power plants with 11.3 GW of operating capacity.
Frequently asked questions
What is the capacity of Shatura GRES power station?
Shatura GRES power station has a capacity of 1.50 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Shatura GRES power station?
Shatura GRES power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Shatura GRES power station?
Shatura GRES power station is owned by Unipro PJSC.
Where is Shatura GRES power station located?
It is located in Moscow, Russia. Approximate coordinates: 55.5794, 39.5605.
Is Shatura GRES power station operational?
According to the latest data, Shatura GRES power station is in operation. Operating means the facility is built and in commercial service.
When did Shatura GRES power station start operating?
Start year: 1971. Current status: Operating. Its 7 operating units were commissioned between 1971 and 2010.
How much electricity does Shatura GRES power station generate?
Actual output data are not published for every plant. As an indicative estimate, Shatura GRES power station would produce about 5.3 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Shatura GRES power station compared with other facilities in Russia?
Shatura GRES power station ranks #16 by capacity among 226 comparable oil & gas facilities tracked in Russia.