Global Energy Monitor tracks 11 units or phases at this site (under construction 896 MW, planned 480 MW, retired 1.91 GW).
Technology: unknown, steam turbine, combined cycle, supercritical; fuel: natural gas, fossil liquids: heavy fuel oil, natural gas, coal: bituminous.
Ownership: Kashirskaya GRES LLC (parent company: Inter RAO PJSC; small shareholder(s)).
3 further units or phases are scheduled to come online in 2028–2030. 7 units have already been retired (2019–2021).
Why it matters
- The 18th-largest oil- and gas-fired power station in Russia by capacity (of 239 operating, under-construction and planned oil & gas facilities tracked).
- If completed, it would add 1.38 GW to Russia's oil & gas fleet — equivalent to 1.2% of today's operating oil & gas capacity.
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Russia
Russia has 117.8 GW of operating oil & gas capacity across 226 plants in the Global Energy Monitor dataset — 49% of the country's total operating power capacity of 240.2 GW.
The oil & gas pipeline in Russia includes 3.35 GW under construction and 1.52 GW at earlier planning stages.
Other major oil & gas plants in Russia include Surgut GRES-2 power station (5.74 GW), Kostromskaya GRES power station (3.75 GW) and Perm GRES power station (3.39 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 4 | 300 MW | Retired | unknown | 1976 | 2020 |
| 5 | 300 MW | Retired | unknown | 1976 | 2020 |
| 6 | 300 MW | Retired | unknown | 1976 | 2020 |
| 7 | 80 MW | Retired | steam turbine | 1983 | 2020 |
| CC1 | 448 MW | Construction | combined cycle | 2028 | |
| CC2 | 448 MW | Construction | combined cycle | 2028 | |
| CC3 | 480 MW | Pre-construction | combined cycle | 2030 | |
| Unit 1 | 300 MW | Retired | supercritical | 1966 | 2019 |
| Unit 2 | 300 MW | Retired | supercritical | 1966 | 2019 |
| Unit 3 | 330 MW | Retired | supercritical | 1966 | 2021 |
| Unit 9 | 330 MW | Cancelled | supercritical |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Kashirskaya power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Kashirskaya power station is located in Moscow, Russia, at approximately 54.8581, 38.2597. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Kashirskaya power station is owned by Kashirskaya GRES LLC. The ultimate parent company is Inter RAO PJSC; small shareholder(s). Across the dataset, Inter RAO PJSC is linked to 45 power plants in 7 countries, with 29.7 GW of operating capacity.
Frequently asked questions
What is the capacity of Kashirskaya power station?
Kashirskaya power station has a capacity of 1.38 GW according to the latest Global Energy Monitor data. This figure covers the 11 units or phases listed for the site.
What type of facility is Kashirskaya power station?
Kashirskaya power station is a oil- and gas-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Kashirskaya power station?
Kashirskaya power station is owned by Kashirskaya GRES LLC. The ultimate parent company is Inter RAO PJSC; small shareholder(s).
Where is Kashirskaya power station located?
It is located in Moscow, Russia. Approximate coordinates: 54.8581, 38.2597.
Is Kashirskaya power station operational?
According to the latest data, Kashirskaya power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Kashirskaya power station expected to start?
Start year: 1966. Current status: Construction. 3 further units or phases are scheduled to come online in 2028–2030. 7 units have already been retired (2019–2021).
How big is Kashirskaya power station compared with other facilities in Russia?
Kashirskaya power station ranks #18 by capacity among 239 comparable oil & gas facilities tracked in Russia.