Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 1.24 GW, planned 460 MW).
Technology: subcritical, unknown; fuel: coal: lignite.
Ownership: Inter RAO – Electric Power Generation JSC (parent company: Inter RAO PJSC).
Its 6 operating units were commissioned between 1976 and 1992.
Why it matters
- The 9th-largest coal-fired power station in Russia by capacity (of 59 operating coal facilities tracked).
- Provides about 3.5% of Russia's operating coal capacity and roughly 0.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.4 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Russia
Russia has 35.1 GW of operating coal capacity across 59 plants in the Global Energy Monitor dataset — 15% of the country's total operating power capacity of 240.2 GW.
The coal pipeline in Russia includes 440 MW under construction and 3.96 GW at earlier planning stages.
Other major coal plants in Russia include Reftinskaya GRES power station (3.80 GW), Berezovskaya power station (2.42 GW) and Novocherkasskaya GRES power station (2.26 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 200 MW | subcritical | 1976 | ||
| Unit 2 | 210 MW | subcritical | 1977 | ||
| Unit 3 | 204 MW | subcritical | 1978 | ||
| Unit 4 | 210 MW | subcritical | 1979 | ||
| Unit 5 | 210 MW | subcritical | 1988 | ||
| Unit 6 | 210 MW | subcritical | 1992 | ||
| Unit 7 | 230 MW | Announced | unknown | ||
| Unit 8 | 230 MW | Announced | unknown |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Gusinoozyorskaya power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Gusinoozyorskaya power station is located in Buryatia, Russia, at approximately 51.2984, 106.4841. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Gusinoozyorskaya power station is owned by Inter RAO – Electric Power Generation JSC. The ultimate parent company is Inter RAO PJSC. Across the dataset, Inter RAO PJSC is linked to 45 power plants in 7 countries, with 29.7 GW of operating capacity.
Frequently asked questions
What is the capacity of Gusinoozyorskaya power station?
Gusinoozyorskaya power station has a capacity of 1.24 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Gusinoozyorskaya power station?
Gusinoozyorskaya power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Gusinoozyorskaya power station?
Gusinoozyorskaya power station is owned by Inter RAO – Electric Power Generation JSC. The ultimate parent company is Inter RAO PJSC.
Where is Gusinoozyorskaya power station located?
It is located in Buryatia, Russia. Approximate coordinates: 51.2984, 106.4841.
Is Gusinoozyorskaya power station operational?
According to the latest data, Gusinoozyorskaya power station is in operation. Operating means the facility is built and in commercial service.
When did Gusinoozyorskaya power station start operating?
Start year: 1976. Current status: Operating. Its 6 operating units were commissioned between 1976 and 1992.
How much electricity does Gusinoozyorskaya power station generate?
Actual output data are not published for every plant. As an indicative estimate, Gusinoozyorskaya power station would produce about 5.4 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Gusinoozyorskaya power station compared with other facilities in Russia?
Gusinoozyorskaya power station ranks #9 by capacity among 59 comparable coal facilities tracked in Russia.