Overview
Global Energy Monitor tracks 9 units or phases at this site (operating 5.74 GW, planned 830 MW).
Technology: steam turbine, combined cycle; fuel: natural gas, fossil gas: unknown.
Ownership: Unipro PJSC.
Its 8 operating units were commissioned between 1985 and 2011. 1 further units or phases are scheduled to come online in 2028. 1 operating units have a planned retirement date, the earliest in 2028.
Why it matters
- The largest oil- and gas-fired power station in Russia by capacity, out of 226 operating oil & gas facilities tracked in the country.
- Provides about 4.9% of Russia's operating oil & gas capacity and roughly 2.4% of all operating power capacity in the country in the dataset.
- Ranks #5 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 20 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Russia
Russia has 117.8 GW of operating oil & gas capacity across 226 plants in the Global Energy Monitor dataset — 49% of the country's total operating power capacity of 240.2 GW.
The oil & gas pipeline in Russia includes 3.35 GW under construction and 1.52 GW at earlier planning stages.
Other major oil & gas plants in Russia include Kostromskaya GRES power station (3.75 GW), Perm GRES power station (3.39 GW) and Surgut GRES-1 power station (3.31 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 830 MW | steam turbine | 1985 | ||
| 2 | 810 MW | steam turbine | 1985 | ||
| 3 | 810 MW | steam turbine | 1986 | ||
| 4 | 830 MW | steam turbine | 1987 | ||
| 5 | 810 MW | steam turbine | 1987 | 2028 | |
| 5R | 830 MW | Pre-construction | steam turbine | 2028 | |
| 6 | 830 MW | steam turbine | 1988 | ||
| CC1 | 412 MW | combined cycle | 2011 | ||
| CC2 | 410 MW | combined cycle | 2011 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Surgut GRES-2 power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Surgut GRES-2 power station is located in Khanty-Mansi, Russia, at approximately 61.2794, 73.4889. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Surgut GRES-2 power station is owned by Unipro PJSC. Across the dataset, Unipro PJSC is linked to 5 power plants with 11.3 GW of operating capacity.
Frequently asked questions
What is the capacity of Surgut GRES-2 power station?
Surgut GRES-2 power station has a capacity of 5.74 GW according to the latest Global Energy Monitor data. This figure covers the 9 units or phases listed for the site.
What type of facility is Surgut GRES-2 power station?
Surgut GRES-2 power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Surgut GRES-2 power station?
Surgut GRES-2 power station is owned by Unipro PJSC.
Where is Surgut GRES-2 power station located?
It is located in Khanty-Mansi, Russia. Approximate coordinates: 61.2794, 73.4889.
Is Surgut GRES-2 power station operational?
According to the latest data, Surgut GRES-2 power station is in operation. Operating means the facility is built and in commercial service.
When did Surgut GRES-2 power station start operating?
Start year: 1985. Current status: Operating. Its 8 operating units were commissioned between 1985 and 2011. 1 further units or phases are scheduled to come online in 2028. 1 operating units have a planned retirement date, the earliest in 2028.
How much electricity does Surgut GRES-2 power station generate?
Actual output data are not published for every plant. As an indicative estimate, Surgut GRES-2 power station would produce about 20 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Surgut GRES-2 power station compared with other facilities in Russia?
Surgut GRES-2 power station ranks #1 by capacity among 226 comparable oil & gas facilities tracked in Russia.