Nuclear · Russia

Leningrad nuclear power plant

Leningrad nuclear power plant is a 4.38 GW nuclear power plant located in Leningrad, Russia. The facility is currently in operation, with its first unit entering service in 1980.

4.38 GWCapacity
OperatingStatus
1980Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 8 units or phases at this site (operating 4.38 GW, under construction 2.40 GW, retired 2.00 GW).

Technology: light water graphite reactor, pressurized water reactor.

Ownership: Rosatom.

Its 4 operating units were commissioned between 1980 and 2021. 2 further units or phases are scheduled to come online in 2030–2032. 2 units have already been retired (2018–2020).

Why it matters

  • The largest nuclear power plant in Russia by capacity, out of 10 operating nuclear facilities tracked in the country.
  • Provides about 15% of Russia's operating nuclear capacity and roughly 1.8% of all operating power capacity in the country in the dataset.
  • Ranks #17 worldwide among nuclear facilities of the same status group by capacity.
  • At a typical capacity factor of 85% for this technology, it would generate roughly 33 TWh of electricity a year (indicative estimate).

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in Russia

Russia has 29.8 GW of operating nuclear capacity across 10 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 240.2 GW.

The nuclear pipeline in Russia includes 744 MW under construction and 13.7 GW at earlier planning stages.

Other major nuclear plants in Russia include Rostov nuclear power plant (4.07 GW), Balakovo nuclear power plant (4.00 GW) and Kalinin nuclear power plant (4.00 GW).

See the full list: Nuclear power plants in Russia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1-1 1.00 GW Retired light water graphite reactor 1974 2018
1-2 1.00 GW Retired light water graphite reactor 1976 2020
1-3 1.00 GW Operating light water graphite reactor 1980
1-4 1.00 GW Operating light water graphite reactor 1981
2-1 1.19 GW Operating pressurized water reactor 2018
2-2 1.19 GW Operating pressurized water reactor 2021
2-3 1.20 GW Construction pressurized water reactor 2030
2-4 1.20 GW Construction pressurized water reactor 2032

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Leningrad nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Leningrad nuclear power plant is located in Leningrad, Russia, at approximately 59.8525, 29.0486. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Leningrad nuclear power plant is owned by Rosatom. Across the dataset, Rosatom is linked to 43 power plants in 8 countries, with 33.4 GW of operating capacity.

Frequently asked questions

What is the capacity of Leningrad nuclear power plant?

Leningrad nuclear power plant has a capacity of 4.38 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.

What type of facility is Leningrad nuclear power plant?

Leningrad nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Leningrad nuclear power plant?

Leningrad nuclear power plant is owned by Rosatom.

Where is Leningrad nuclear power plant located?

It is located in Leningrad, Russia. Approximate coordinates: 59.8525, 29.0486.

Is Leningrad nuclear power plant operational?

According to the latest data, Leningrad nuclear power plant is in operation. Operating means the facility is built and in commercial service.

When did Leningrad nuclear power plant start operating?

Start year: 1980. Current status: Operating. Its 4 operating units were commissioned between 1980 and 2021. 2 further units or phases are scheduled to come online in 2030–2032. 2 units have already been retired (2018–2020).

How much electricity does Leningrad nuclear power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Leningrad nuclear power plant would produce about 33 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.

How big is Leningrad nuclear power plant compared with other facilities in Russia?

Leningrad nuclear power plant ranks #1 by capacity among 10 comparable nuclear facilities tracked in Russia.

Latest news on Leningrad nuclear power plant

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects