Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 4.38 GW, under construction 2.40 GW, retired 2.00 GW).
Technology: light water graphite reactor, pressurized water reactor.
Ownership: Rosatom.
Its 4 operating units were commissioned between 1980 and 2021. 2 further units or phases are scheduled to come online in 2030–2032. 2 units have already been retired (2018–2020).
Why it matters
- The largest nuclear power plant in Russia by capacity, out of 10 operating nuclear facilities tracked in the country.
- Provides about 15% of Russia's operating nuclear capacity and roughly 1.8% of all operating power capacity in the country in the dataset.
- Ranks #17 worldwide among nuclear facilities of the same status group by capacity.
- At a typical capacity factor of 85% for this technology, it would generate roughly 33 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Russia
Russia has 29.8 GW of operating nuclear capacity across 10 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 240.2 GW.
The nuclear pipeline in Russia includes 744 MW under construction and 13.7 GW at earlier planning stages.
Other major nuclear plants in Russia include Rostov nuclear power plant (4.07 GW), Balakovo nuclear power plant (4.00 GW) and Kalinin nuclear power plant (4.00 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1-1 | 1.00 GW | Retired | light water graphite reactor | 1974 | 2018 |
| 1-2 | 1.00 GW | Retired | light water graphite reactor | 1976 | 2020 |
| 1-3 | 1.00 GW | light water graphite reactor | 1980 | ||
| 1-4 | 1.00 GW | light water graphite reactor | 1981 | ||
| 2-1 | 1.19 GW | pressurized water reactor | 2018 | ||
| 2-2 | 1.19 GW | pressurized water reactor | 2021 | ||
| 2-3 | 1.20 GW | Construction | pressurized water reactor | 2030 | |
| 2-4 | 1.20 GW | Construction | pressurized water reactor | 2032 |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Leningrad nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Location
Leningrad nuclear power plant is located in Leningrad, Russia, at approximately 59.8525, 29.0486. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Leningrad nuclear power plant is owned by Rosatom. Across the dataset, Rosatom is linked to 43 power plants in 8 countries, with 33.4 GW of operating capacity.
Frequently asked questions
What is the capacity of Leningrad nuclear power plant?
Leningrad nuclear power plant has a capacity of 4.38 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Leningrad nuclear power plant?
Leningrad nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Leningrad nuclear power plant?
Leningrad nuclear power plant is owned by Rosatom.
Where is Leningrad nuclear power plant located?
It is located in Leningrad, Russia. Approximate coordinates: 59.8525, 29.0486.
Is Leningrad nuclear power plant operational?
According to the latest data, Leningrad nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Leningrad nuclear power plant start operating?
Start year: 1980. Current status: Operating. Its 4 operating units were commissioned between 1980 and 2021. 2 further units or phases are scheduled to come online in 2030–2032. 2 units have already been retired (2018–2020).
How much electricity does Leningrad nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Leningrad nuclear power plant would produce about 33 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Leningrad nuclear power plant compared with other facilities in Russia?
Leningrad nuclear power plant ranks #1 by capacity among 10 comparable nuclear facilities tracked in Russia.