Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 1.20 GW, planned 800 MW).
Technology: ultra-supercritical, subcritical; fuel: coal: unknown.
Ownership: Haryana Power Generation Co Ltd.
Its 2 operating units were commissioned between 2010 and 2011.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 3 | 800 MW | Announced | ultra-supercritical | ||
| Unit I | 600 MW | subcritical | 2010 | ||
| Unit II | 600 MW | subcritical | 2011 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Rajiv Gandhi Thermal Power Project
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Rajiv Gandhi Thermal Power Project is located in Haryana, India, at approximately 29.3470, 75.8575. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Rajiv Gandhi Thermal Power Project is owned by Haryana Power Generation Co Ltd. Across the dataset, Haryana Power Generation Co Ltd is linked to 6 power plants with 4.07 GW of operating capacity.
Frequently asked questions
What is the capacity of Rajiv Gandhi Thermal Power Project?
Rajiv Gandhi Thermal Power Project has a capacity of 1.20 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Rajiv Gandhi Thermal Power Project?
Rajiv Gandhi Thermal Power Project is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Rajiv Gandhi Thermal Power Project?
Rajiv Gandhi Thermal Power Project is owned by Haryana Power Generation Co Ltd.
Where is Rajiv Gandhi Thermal Power Project located?
It is located in Haryana, India. Approximate coordinates: 29.3470, 75.8575.
Is Rajiv Gandhi Thermal Power Project operational?
According to the latest data, Rajiv Gandhi Thermal Power Project is in operation. Operating means the facility is built and in commercial service.
When did Rajiv Gandhi Thermal Power Project start operating?
Start year: 2010. Current status: Operating. Its 2 operating units were commissioned between 2010 and 2011.
How much electricity does Rajiv Gandhi Thermal Power Project generate?
Actual output data are not published for every plant. As an indicative estimate, Rajiv Gandhi Thermal Power Project would produce about 5.3 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Rajiv Gandhi Thermal Power Project compared with other facilities in India?
Rajiv Gandhi Thermal Power Project ranks #84 by capacity among 285 comparable coal facilities tracked in India.