Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 1.50 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Pragati Power Corp Ltd (parent company: Government of National Capital Territory of Delhi).
Its 2 operating units were commissioned between 2012 and 2014.
Why it matters
- The 2nd-largest oil- and gas-fired power station in India by capacity (of 74 operating oil & gas facilities tracked).
- Provides about 5.2% of India's operating oil & gas capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in India
India has 28.9 GW of operating oil & gas capacity across 74 plants in the Global Energy Monitor dataset — 5.9% of the country's total operating power capacity of 485.3 GW.
The oil & gas pipeline in India includes 1.02 GW at earlier planning stages.
Other major oil & gas plants in India include Ratnagiri Combined Cycle power plant (1.97 GW), Kondapalli Combined Cycle power plant (1.48 GW) and DGEN Mega Combined Cycle power plant (1.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 750 MW | combined cycle | 2012 | ||
| 2 | 750 MW | combined cycle | 2014 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Pragati Combined Cycle Gas Turbine-III power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Pragati Combined Cycle Gas Turbine-III power station is located in Delhi, India, at approximately 28.7963, 77.0710. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Pragati Combined Cycle Gas Turbine-III power station is owned by Pragati Power Corp Ltd. The ultimate parent company is Government of National Capital Territory of Delhi. Across the dataset, Government of National Capital Territory of Delhi is linked to 2 power plants with 1.83 GW of operating capacity.
Frequently asked questions
What is the capacity of Pragati Combined Cycle Gas Turbine-III power station?
Pragati Combined Cycle Gas Turbine-III power station has a capacity of 1.50 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Pragati Combined Cycle Gas Turbine-III power station?
Pragati Combined Cycle Gas Turbine-III power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Pragati Combined Cycle Gas Turbine-III power station?
Pragati Combined Cycle Gas Turbine-III power station is owned by Pragati Power Corp Ltd. The ultimate parent company is Government of National Capital Territory of Delhi.
Where is Pragati Combined Cycle Gas Turbine-III power station located?
It is located in Delhi, India. Approximate coordinates: 28.7963, 77.0710.
Is Pragati Combined Cycle Gas Turbine-III power station operational?
According to the latest data, Pragati Combined Cycle Gas Turbine-III power station is in operation. Operating means the facility is built and in commercial service.
When did Pragati Combined Cycle Gas Turbine-III power station start operating?
Start year: 2012. Current status: Operating. Its 2 operating units were commissioned between 2012 and 2014.
How much electricity does Pragati Combined Cycle Gas Turbine-III power station generate?
Actual output data are not published for every plant. As an indicative estimate, Pragati Combined Cycle Gas Turbine-III power station would produce about 5.3 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Pragati Combined Cycle Gas Turbine-III power station compared with other facilities in India?
Pragati Combined Cycle Gas Turbine-III power station ranks #2 by capacity among 74 comparable oil & gas facilities tracked in India.