Coal · India

Talwandi Sabo Power Project

Talwandi Sabo Power Project is a 1.98 GW coal-fired power station located in Punjab, India. The facility is currently in operation, with its first unit entering service in 2014.

1.98 GWCapacity
OperatingStatus
2014Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (operating 1.98 GW).

Technology: supercritical, unknown; fuel: coal: bituminous, coal: unknown.

Ownership: Vedanta Power Ltd (parent company: Vedanta Ltd).

Its 3 operating units were commissioned between 2014 and 2016.

Why it matters

  • At a typical capacity factor of 50% for this technology, it would generate roughly 8.7 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in India

India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.

The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.

Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).

See the full list: Coal power plants in India →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 660 MW Operating supercritical 2014
Unit 2 660 MW Operating supercritical 2015
Unit 3 660 MW Operating supercritical 2016
Unit 4 660 MW Cancelled unknown

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Talwandi Sabo Power Project

Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Talwandi Sabo Power Project is located in Punjab, India, at approximately 29.9246, 75.2389. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Talwandi Sabo Power Project is owned by Vedanta Power Ltd. The ultimate parent company is Vedanta Ltd. Across the dataset, Vedanta Ltd is linked to 6 power plants with 7.99 GW of operating capacity.

Frequently asked questions

What is the capacity of Talwandi Sabo Power Project?

Talwandi Sabo Power Project has a capacity of 1.98 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Talwandi Sabo Power Project?

Talwandi Sabo Power Project is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.

Who owns Talwandi Sabo Power Project?

Talwandi Sabo Power Project is owned by Vedanta Power Ltd. The ultimate parent company is Vedanta Ltd.

Where is Talwandi Sabo Power Project located?

It is located in Punjab, India. Approximate coordinates: 29.9246, 75.2389.

Is Talwandi Sabo Power Project operational?

According to the latest data, Talwandi Sabo Power Project is in operation. Operating means the facility is built and in commercial service.

When did Talwandi Sabo Power Project start operating?

Start year: 2014. Current status: Operating. Its 3 operating units were commissioned between 2014 and 2016.

How much electricity does Talwandi Sabo Power Project generate?

Actual output data are not published for every plant. As an indicative estimate, Talwandi Sabo Power Project would produce about 8.7 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Talwandi Sabo Power Project compared with other facilities in India?

Talwandi Sabo Power Project ranks #33 by capacity among 285 comparable coal facilities tracked in India.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects