Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 2.06 GW, under construction 2.31 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Al-Mourjan for Electricity Production Co (parent company: ACWA Power Co; Saudi Electricity Co).
Why it matters
- The 17th-largest oil- and gas-fired power station in Saudi Arabia by capacity (of 97 operating oil & gas facilities tracked).
- Provides about 2% of Saudi Arabia's operating oil & gas capacity and roughly 1.8% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 7.2 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Saudi Arabia
Saudi Arabia has 100.6 GW of operating oil & gas capacity across 97 plants in the Global Energy Monitor dataset — 89% of the country's total operating power capacity of 112.6 GW.
The oil & gas pipeline in Saudi Arabia includes 14.9 GW under construction and 6.00 GW at earlier planning stages.
Other major oil & gas plants in Saudi Arabia include Rabigh 1 power plant (4.48 GW), Ghazlan power plant (4.26 GW) and Qurayyah CC power plant (4.10 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 687 MW | combined cycle | 2018 | ||
| 2 | 687 MW | combined cycle | 2018 | ||
| 3 | 687 MW | combined cycle | 2018 | ||
| CC-Expansion | 2.31 GW | Construction | combined cycle |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Rabigh 2 IPP power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Rabigh 2 IPP power station is located in Makkah, Saudi Arabia, at approximately 22.6289, 39.0467. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Rabigh 2 IPP power station is owned by Al-Mourjan for Electricity Production Co. The ultimate parent company is ACWA Power Co; Saudi Electricity Co. Across the dataset, ACWA Power Co is linked to 75 power plants in 16 countries, with 40.3 GW of operating capacity.
Frequently asked questions
What is the capacity of Rabigh 2 IPP power station?
Rabigh 2 IPP power station has a capacity of 2.06 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Rabigh 2 IPP power station?
Rabigh 2 IPP power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Rabigh 2 IPP power station?
Rabigh 2 IPP power station is owned by Al-Mourjan for Electricity Production Co. The ultimate parent company is ACWA Power Co; Saudi Electricity Co.
Where is Rabigh 2 IPP power station located?
It is located in Makkah, Saudi Arabia. Approximate coordinates: 22.6289, 39.0467.
Is Rabigh 2 IPP power station operational?
According to the latest data, Rabigh 2 IPP power station is in operation. Operating means the facility is built and in commercial service.
When did Rabigh 2 IPP power station start operating?
Start year: 2018. Current status: Operating.
How much electricity does Rabigh 2 IPP power station generate?
Actual output data are not published for every plant. As an indicative estimate, Rabigh 2 IPP power station would produce about 7.2 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Rabigh 2 IPP power station compared with other facilities in Saudi Arabia?
Rabigh 2 IPP power station ranks #17 by capacity among 97 comparable oil & gas facilities tracked in Saudi Arabia.