Al-Muwaih Solar PV is a 2.00 GW solar power plant located in Mecca, Saudi Arabia. The facility is currently under construction, with a targeted start date of 2027.

2.00 GWCapacity (all phases)
ConstructionStatus
2027Start year
View on the interactive map →

Overview

Technology: PV.

Ownership: ACWA Power Co; Saudi Aramco Power Co; Public Investment Fund (Saudi Arabia).

Why it matters

  • The 5th-largest solar power plant in Saudi Arabia by capacity (of 92 operating, under-construction and planned solar facilities tracked).
  • If completed, it would add 2.00 GW to Saudi Arabia's solar fleet — equivalent to 17% of today's operating solar capacity.
  • Ranks #97 worldwide among solar facilities of the same status group by capacity.

Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Solar power in Saudi Arabia

Saudi Arabia has 11.6 GW of operating solar capacity across 63 plants in the Global Energy Monitor dataset — 10% of the country's total operating power capacity of 112.6 GW.

The solar pipeline in Saudi Arabia includes 8.02 GW under construction and 23.7 GW at earlier planning stages.

Other major solar plants in Saudi Arabia include NEOM Green Hydrogen solar farm (2.20 GW), Shuaibah 2 solar farm (2.06 GW) and Ar Rass Solar PV 2 (2.00 GW).

See the full list: Solar farms in Saudi Arabia →

How solar farms work

Most utility-scale solar plants use photovoltaic (PV) panels that convert sunlight directly into direct current, which inverters turn into alternating current for the grid. A smaller number of concentrated solar power (CSP) plants use mirrors to focus sunlight and heat a fluid that drives a steam turbine.

Solar output follows the daily and seasonal path of the sun, giving typical capacity factors of 15–30% depending on latitude and whether panels track the sun. Its costs have fallen by around 90% over the past decade, making it the fastest-growing power source worldwide; pairing plants with batteries shifts part of their output into the evening peak.

Technology at Al-Muwaih Solar PV

The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Al-Muwaih Solar PV is located in Mecca, Saudi Arabia, at approximately 22.7560, 41.5881. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Al-Muwaih Solar PV is owned by ACWA Power Co; Saudi Aramco Power Co; Public Investment Fund (Saudi Arabia). Across the dataset, ACWA Power Co is linked to 75 power plants in 16 countries, with 40.3 GW of operating capacity.

Frequently asked questions

What is the capacity of Al-Muwaih Solar PV?

Al-Muwaih Solar PV has a capacity of 2.00 GW according to the latest Global Energy Monitor data.

What type of facility is Al-Muwaih Solar PV?

Al-Muwaih Solar PV is a solar power plant. The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Who owns Al-Muwaih Solar PV?

Al-Muwaih Solar PV is owned by ACWA Power Co; Saudi Aramco Power Co; Public Investment Fund (Saudi Arabia).

Where is Al-Muwaih Solar PV located?

It is located in Mecca, Saudi Arabia. Approximate coordinates: 22.7560, 41.5881.

Is Al-Muwaih Solar PV operational?

According to the latest data, Al-Muwaih Solar PV is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Al-Muwaih Solar PV expected to start?

Start year: 2027. Current status: Construction.

How big is Al-Muwaih Solar PV compared with other facilities in Saudi Arabia?

Al-Muwaih Solar PV ranks #5 by capacity among 92 comparable solar facilities tracked in Saudi Arabia.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects