Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.39 GW).
Technology: subcritical, supercritical; fuel: coal: bituminous.
Ownership: EnergyAustralia Pty Ltd (parent company: CLP Holdings Ltd).
Its 2 operating units were commissioned between 1993 and 1996. 2 operating units have a planned retirement date, the earliest in 2040.
Why it matters
- The 9th-largest coal-fired power station in Australia by capacity (of 18 operating coal facilities tracked).
- Provides about 6.1% of Australia's operating coal capacity and roughly 1.8% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 6.1 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Australia
Australia has 22.7 GW of operating coal capacity across 18 plants in the Global Energy Monitor dataset — 29% of the country's total operating power capacity of 79.3 GW.
The coal pipeline in Australia includes 945 MW at earlier planning stages.
Other major coal plants in Australia include Eraring power station (2.88 GW), Bayswater power station (2.67 GW) and Loy Yang A power station (2.22 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 730 MW | subcritical | 1993 | 2040 | |
| Unit 2 | 660 MW | subcritical | 1996 | 2040 | |
| Unit 3 | 750 MW | Cancelled | supercritical | ||
| Unit 4 | 750 MW | Cancelled | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Mount Piper power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Mount Piper power station is located in New South Wales, Australia, at approximately -33.3586, 150.0316. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Mount Piper power station is owned by EnergyAustralia Pty Ltd. The ultimate parent company is CLP Holdings Ltd. Across the dataset, CLP Holdings Ltd is linked to 13 power plants in 4 countries, with 17.6 GW of operating capacity.
Frequently asked questions
What is the capacity of Mount Piper power station?
Mount Piper power station has a capacity of 1.39 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Mount Piper power station?
Mount Piper power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Mount Piper power station?
Mount Piper power station is owned by EnergyAustralia Pty Ltd. The ultimate parent company is CLP Holdings Ltd.
Where is Mount Piper power station located?
It is located in New South Wales, Australia. Approximate coordinates: -33.3586, 150.0316.
Is Mount Piper power station operational?
According to the latest data, Mount Piper power station is in operation. Operating means the facility is built and in commercial service.
When did Mount Piper power station start operating?
Start year: 1993. Current status: Operating. Its 2 operating units were commissioned between 1993 and 1996. 2 operating units have a planned retirement date, the earliest in 2040.
How much electricity does Mount Piper power station generate?
Actual output data are not published for every plant. As an indicative estimate, Mount Piper power station would produce about 6.1 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Mount Piper power station compared with other facilities in Australia?
Mount Piper power station ranks #9 by capacity among 18 comparable coal facilities tracked in Australia.