Coal · Taiwan

Ho-Ping power station

Ho-Ping power station is a 1.32 GW coal-fired power station located in Hualien, Taiwan. The facility is currently in operation, with its first unit entering service in 2002.

1.32 GWCapacity
OperatingStatus
2002Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (operating 1.32 GW).

Technology: subcritical; fuel: coal: unknown.

Ownership: Ho-Ping Power Co (parent company: TCC Group Holdings Co Ltd; CLP Holdings Ltd; Mitsubishi Corp).

2 operating units have a planned retirement date, the earliest in 2040.

Why it matters

  • The 3rd-largest coal-fired power station in Taiwan by capacity (of 14 operating coal facilities tracked).
  • Provides about 16% of Taiwan's operating coal capacity and roughly 2.4% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 50% for this technology, it would generate roughly 5.8 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in Taiwan

Taiwan has 8.16 GW of operating coal capacity across 14 plants in the Global Energy Monitor dataset — 15% of the country's total operating power capacity of 54.8 GW.

Other major coal plants in Taiwan include Linkou power station (2.40 GW) and Talin power station (2.15 GW).

See the full list: Coal power plants in Taiwan →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 660 MW Operating subcritical 2002 2040
Unit 2 660 MW Operating subcritical 2002 2040

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Ho-Ping power station

Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Ho-Ping power station is located in Hualien, Taiwan, at approximately 24.3078, 121.7635. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Ho-Ping power station is owned by Ho-Ping Power Co. The ultimate parent company is TCC Group Holdings Co Ltd; CLP Holdings Ltd; Mitsubishi Corp. Across the dataset, TCC Group Holdings Co Ltd is linked to 3 power plants with 1.37 GW of operating capacity.

Frequently asked questions

What is the capacity of Ho-Ping power station?

Ho-Ping power station has a capacity of 1.32 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Ho-Ping power station?

Ho-Ping power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Who owns Ho-Ping power station?

Ho-Ping power station is owned by Ho-Ping Power Co. The ultimate parent company is TCC Group Holdings Co Ltd; CLP Holdings Ltd; Mitsubishi Corp.

Where is Ho-Ping power station located?

It is located in Hualien, Taiwan. Approximate coordinates: 24.3078, 121.7635.

Is Ho-Ping power station operational?

According to the latest data, Ho-Ping power station is in operation. Operating means the facility is built and in commercial service.

When did Ho-Ping power station start operating?

Start year: 2002. Current status: Operating. 2 operating units have a planned retirement date, the earliest in 2040.

How much electricity does Ho-Ping power station generate?

Actual output data are not published for every plant. As an indicative estimate, Ho-Ping power station would produce about 5.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Ho-Ping power station compared with other facilities in Taiwan?

Ho-Ping power station ranks #3 by capacity among 14 comparable coal facilities tracked in Taiwan.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects