Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.00 GW, planned 2.60 GW).
Technology: combined cycle, steam turbine; fuel: LNG, heavy fuel oil.
Ownership: Taiwan Power Co (parent company: Government of Taiwan; small shareholder(s)).
Its 2 operating units were commissioned between 1980 and 1985. 2 further units or phases are scheduled to come online in 2031–2037. 2 operating units have a planned retirement date, the earliest in 2032.
Why it matters
- The 9th-largest oil- and gas-fired power station in Taiwan by capacity (of 22 operating oil & gas facilities tracked).
- Provides about 3.1% of Taiwan's operating oil & gas capacity and roughly 1.8% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.5 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Taiwan
Taiwan has 32.0 GW of operating oil & gas capacity across 22 plants in the Global Energy Monitor dataset — 58% of the country's total operating power capacity of 54.8 GW.
The oil & gas pipeline in Taiwan includes 645 MW under construction and 1.28 GW at earlier planning stages.
Other major oil & gas plants in Taiwan include Datan power station (7.54 GW), Taichung power station (5.78 GW) and Hsinta power station (3.53 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Gas 1 | 1.30 GW | Pre-construction | combined cycle | 2031 | |
| Gas 2 | 1.30 GW | Pre-construction | combined cycle | 2037 | |
| Oil 3 | 500 MW | steam turbine | 1980 | 2032 | |
| Oil 4 | 500 MW | steam turbine | 1985 | 2032 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Hsieh-Ho power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Hsieh-Ho power station is located in Taiwan, at approximately 25.1572, 121.7397. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Hsieh-Ho power station is owned by Taiwan Power Co. The ultimate parent company is Government of Taiwan; small shareholder(s). Across the dataset, Government of Taiwan is linked to 11 power plants with 26.9 GW of operating capacity.
Frequently asked questions
What is the capacity of Hsieh-Ho power station?
Hsieh-Ho power station has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Hsieh-Ho power station?
Hsieh-Ho power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Hsieh-Ho power station?
Hsieh-Ho power station is owned by Taiwan Power Co. The ultimate parent company is Government of Taiwan; small shareholder(s).
Where is Hsieh-Ho power station located?
It is located in Taiwan. Approximate coordinates: 25.1572, 121.7397.
Is Hsieh-Ho power station operational?
According to the latest data, Hsieh-Ho power station is in operation. Operating means the facility is built and in commercial service.
When did Hsieh-Ho power station start operating?
Start year: 1980. Current status: Operating. Its 2 operating units were commissioned between 1980 and 1985. 2 further units or phases are scheduled to come online in 2031–2037. 2 operating units have a planned retirement date, the earliest in 2032.
How much electricity does Hsieh-Ho power station generate?
Actual output data are not published for every plant. As an indicative estimate, Hsieh-Ho power station would produce about 3.5 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Hsieh-Ho power station compared with other facilities in Taiwan?
Hsieh-Ho power station ranks #9 by capacity among 22 comparable oil & gas facilities tracked in Taiwan.