Overview
Global Energy Monitor tracks 17 units or phases at this site (operating 3.53 GW, under construction 2.60 GW, planned 2.80 GW, shelved / mothballed 2.10 GW).
Technology: combined cycle, unknown, subcritical; fuel: LNG, LNG [95%], other: hydrogen (unknown) [5%], coal: unknown, coal: bituminous, wood & other biomass (solids).
Ownership: Taiwan Power Co (parent company: Government of Taiwan; small shareholder(s)).
Its 6 operating units were commissioned between 1998 and 2025. 4 further units or phases are scheduled to come online in 2027–2032. 5 operating units have a planned retirement date, the earliest in 2037.
Why it matters
- The 3rd-largest oil- and gas-fired power station in Taiwan by capacity (of 22 operating oil & gas facilities tracked).
- Provides about 11% of Taiwan's operating oil & gas capacity and roughly 6.4% of all operating power capacity in the country in the dataset.
- Ranks #31 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 12 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Taiwan
Taiwan has 32.0 GW of operating oil & gas capacity across 22 plants in the Global Energy Monitor dataset — 58% of the country's total operating power capacity of 54.8 GW.
The oil & gas pipeline in Taiwan includes 645 MW under construction and 1.28 GW at earlier planning stages.
Other major oil & gas plants in Taiwan include Datan power station (7.54 GW), Taichung power station (5.78 GW) and Tunghsiao power station (3.18 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CC1 | 445 MW | combined cycle | 1998 | 2037 | |
| CC2 | 445 MW | combined cycle | 1998 | 2037 | |
| CC3 | 445 MW | combined cycle | 1998 | 2037 | |
| CC4 | 445 MW | combined cycle | 1998 | 2037 | |
| CC5 | 445 MW | combined cycle | 1999 | 2037 | |
| New 1 | 1.30 GW | combined cycle | 2025 | ||
| New 2 | 1.30 GW | Construction | combined cycle | 2027 | |
| New 3 | 1.30 GW | Construction | combined cycle | 2027 | |
| New 4 | 1.40 GW | Announced | combined cycle | 2032 | |
| New 5 | 1.40 GW | Announced | combined cycle | 2032 | |
| New Unit 1 | 1.00 GW | Cancelled | unknown | ||
| New Unit 2 | 1.00 GW | Cancelled | unknown | ||
| Unit 1, timepoint 1 | 500 MW | Mothballed | subcritical | 1982 | 2023 |
| Unit 1, timepoint 2 | 500 MW | Cancelled | |||
| Unit 2 | 500 MW | Mothballed | subcritical | 1983 | 2023 |
| Unit 3 | 550 MW | Mothballed | subcritical | 1985 | 2025 |
| Unit 4 | 550 MW | Mothballed | subcritical | 1986 | 2026 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Hsinta power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Hsinta power station is located in Taiwan, at approximately 22.8484, 120.2025. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Hsinta power station is owned by Taiwan Power Co. The ultimate parent company is Government of Taiwan; small shareholder(s). Across the dataset, Government of Taiwan is linked to 11 power plants with 26.9 GW of operating capacity.
Frequently asked questions
What is the capacity of Hsinta power station?
Hsinta power station has a capacity of 3.53 GW according to the latest Global Energy Monitor data. This figure covers the 17 units or phases listed for the site.
What type of facility is Hsinta power station?
Hsinta power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Hsinta power station?
Hsinta power station is owned by Taiwan Power Co. The ultimate parent company is Government of Taiwan; small shareholder(s).
Where is Hsinta power station located?
It is located in Taiwan. Approximate coordinates: 22.8484, 120.2025.
Is Hsinta power station operational?
According to the latest data, Hsinta power station is in operation. Operating means the facility is built and in commercial service.
When did Hsinta power station start operating?
Start year: 1998. Current status: Operating. Its 6 operating units were commissioned between 1998 and 2025. 4 further units or phases are scheduled to come online in 2027–2032. 5 operating units have a planned retirement date, the earliest in 2037.
How much electricity does Hsinta power station generate?
Actual output data are not published for every plant. As an indicative estimate, Hsinta power station would produce about 12 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Hsinta power station compared with other facilities in Taiwan?
Hsinta power station ranks #3 by capacity among 22 comparable oil & gas facilities tracked in Taiwan.