Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 3.06 GW, retired 1.05 GW).
Technology: subcritical; fuel: coal: bituminous.
Ownership: Castle Peak Power Co Ltd (parent company: CLP Holdings Ltd; China Southern Power Grid Co Ltd).
Its 5 operating units were commissioned between 1985 and 1990. 3 units have already been retired (2024). 4 operating units have a planned retirement date, the earliest in 2035.
Why it matters
- The only operating coal plant in Hong Kong recorded in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 13 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Hong Kong
Hong Kong has 3.06 GW of operating coal capacity across 1 plants in the Global Energy Monitor dataset — 30% of the country's total operating power capacity of 10.3 GW.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase A Unit 1 | 350 MW | Retired | subcritical | 1982 | 2024 |
| Phase A Unit 2 | 350 MW | Retired | subcritical | 1983 | 2024 |
| Phase A Unit 3 | 350 MW | Retired | subcritical | 1983 | 2024 |
| Phase A Unit 4 | 350 MW | subcritical | 1985 | ||
| Phase B Unit 1 | 678 MW | subcritical | 1986 | 2035 | |
| Phase B Unit 2 | 678 MW | subcritical | 1987 | 2035 | |
| Phase B Unit 3 | 678 MW | subcritical | 1988 | 2035 | |
| Phase B Unit 4 | 678 MW | subcritical | 1990 | 2035 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Castle Peak power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Castle Peak power station is located in Hong Kong, at approximately 22.3751, 113.9205. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Castle Peak power station is owned by Castle Peak Power Co Ltd. The ultimate parent company is CLP Holdings Ltd; China Southern Power Grid Co Ltd. Across the dataset, CLP Holdings Ltd is linked to 13 power plants in 4 countries, with 17.6 GW of operating capacity.
Frequently asked questions
What is the capacity of Castle Peak power station?
Castle Peak power station has a capacity of 3.06 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Castle Peak power station?
Castle Peak power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Castle Peak power station?
Castle Peak power station is owned by Castle Peak Power Co Ltd. The ultimate parent company is CLP Holdings Ltd; China Southern Power Grid Co Ltd.
Where is Castle Peak power station located?
It is located in Hong Kong. Approximate coordinates: 22.3751, 113.9205.
Is Castle Peak power station operational?
According to the latest data, Castle Peak power station is in operation. Operating means the facility is built and in commercial service.
When did Castle Peak power station start operating?
Start year: 1985. Current status: Operating. Its 5 operating units were commissioned between 1985 and 1990. 3 units have already been retired (2024). 4 operating units have a planned retirement date, the earliest in 2035.
How much electricity does Castle Peak power station generate?
Actual output data are not published for every plant. As an indicative estimate, Castle Peak power station would produce about 13 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.