Heysham nuclear power plant

Heysham nuclear power plant is a 2.61 GW nuclear power plant located in England, United Kingdom. The facility is currently in operation, with its first unit entering service in 1989.

2.61 GWCapacity
OperatingStatus
1989Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (operating 2.61 GW).

Technology: gas-cooled reactor.

Ownership: EDF Energy Ltd.

2 operating units have a planned retirement date, the earliest in 2028.

Why it matters

  • The largest nuclear power plant in United Kingdom by capacity, out of 4 operating nuclear facilities tracked in the country.
  • Provides about 40% of United Kingdom's operating nuclear capacity and roughly 2.7% of all operating power capacity in the country in the dataset.
  • Ranks #56 worldwide among nuclear facilities of the same status group by capacity.
  • At a typical capacity factor of 85% for this technology, it would generate roughly 19 TWh of electricity a year (indicative estimate).

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in United Kingdom

United Kingdom has 6.53 GW of operating nuclear capacity across 4 plants in the Global Energy Monitor dataset — 6.9% of the country's total operating power capacity of 95.1 GW.

The nuclear pipeline in United Kingdom includes 3.44 GW under construction and 5.98 GW at earlier planning stages.

Other major nuclear plants in United Kingdom include Hinkley Point nuclear power plant (3.44 GW), Torness nuclear power plant (1.36 GW) and Hartlepool nuclear power plant (1.31 GW).

See the full list: Nuclear power plants in United Kingdom →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
A1 625 MW Operating gas-cooled reactor 1989 2028
A2 625 MW Operating gas-cooled reactor 1989 2028
B1 680 MW Operating gas-cooled reactor 1989
B2 680 MW Operating gas-cooled reactor 1989

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Heysham nuclear power plant

Gas-cooled reactors use carbon dioxide or helium as coolant and graphite as moderator.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Heysham nuclear power plant is located in England, United Kingdom, at approximately 54.0310, -2.9112. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Heysham nuclear power plant is owned by EDF Energy Ltd. Across the dataset, EDF Energy Ltd is linked to 68 power plants in 8 countries, with 22.4 GW of operating capacity.

Frequently asked questions

What is the capacity of Heysham nuclear power plant?

Heysham nuclear power plant has a capacity of 2.61 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Heysham nuclear power plant?

Heysham nuclear power plant is a nuclear power plant. Gas-cooled reactors use carbon dioxide or helium as coolant and graphite as moderator.

Who owns Heysham nuclear power plant?

Heysham nuclear power plant is owned by EDF Energy Ltd.

Where is Heysham nuclear power plant located?

It is located in England, United Kingdom. Approximate coordinates: 54.0310, -2.9112.

Is Heysham nuclear power plant operational?

According to the latest data, Heysham nuclear power plant is in operation. Operating means the facility is built and in commercial service.

When did Heysham nuclear power plant start operating?

Start year: 1989. Current status: Operating. 2 operating units have a planned retirement date, the earliest in 2028.

How much electricity does Heysham nuclear power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Heysham nuclear power plant would produce about 19 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.

How big is Heysham nuclear power plant compared with other facilities in United Kingdom?

Heysham nuclear power plant ranks #1 by capacity among 4 comparable nuclear facilities tracked in United Kingdom.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects