Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 1.38 GW, planned 1.10 GW).
Technology: combined cycle; fuel: natural gas, fossil gas: unknown, natural gas.
Ownership: Uniper UK Ltd (parent company: Uniper SE).
2 further units or phases are scheduled to come online in 2030.
Why it matters
- The 8th-largest oil- and gas-fired power station in United Kingdom by capacity (of 98 operating oil & gas facilities tracked).
- Provides about 3.7% of United Kingdom's operating oil & gas capacity and roughly 1.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.8 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United Kingdom
United Kingdom has 37.7 GW of operating oil & gas capacity across 98 plants in the Global Energy Monitor dataset — 40% of the country's total operating power capacity of 95.1 GW.
The oil & gas pipeline in United Kingdom includes 2.12 GW under construction and 13.4 GW at earlier planning stages.
Other major oil & gas plants in United Kingdom include Drax power station (2.68 GW), Pembroke power station (2.31 GW) and Staythorpe C power station (1.77 GW).
See the full list: Gas & oil power plants in United Kingdom →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 345 MW | combined cycle | 1996 | ||
| 2 | 345 MW | combined cycle | 1996 | ||
| 3 | 345 MW | combined cycle | 1996 | ||
| 4 | 345 MW | combined cycle | 1996 | ||
| CC1 | 550 MW | Pre-construction | combined cycle | 2030 | |
| CC2 | 550 MW | Pre-construction | combined cycle | 2030 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Connah's Quay power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Connah's Quay power station is located in Wales, United Kingdom, at approximately 53.2317, -3.0815. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Connah's Quay power station is owned by Uniper UK Ltd. The ultimate parent company is Uniper SE. Across the dataset, Uniper SE is linked to 68 power plants in 8 countries, with 15.6 GW of operating capacity.
Frequently asked questions
What is the capacity of Connah's Quay power station?
Connah's Quay power station has a capacity of 1.38 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Connah's Quay power station?
Connah's Quay power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Connah's Quay power station?
Connah's Quay power station is owned by Uniper UK Ltd. The ultimate parent company is Uniper SE.
Where is Connah's Quay power station located?
It is located in Wales, United Kingdom. Approximate coordinates: 53.2317, -3.0815.
Is Connah's Quay power station operational?
According to the latest data, Connah's Quay power station is in operation. Operating means the facility is built and in commercial service.
When did Connah's Quay power station start operating?
Start year: 1996. Current status: Operating. 2 further units or phases are scheduled to come online in 2030.
How much electricity does Connah's Quay power station generate?
Actual output data are not published for every plant. As an indicative estimate, Connah's Quay power station would produce about 4.8 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Connah's Quay power station compared with other facilities in United Kingdom?
Connah's Quay power station ranks #8 by capacity among 98 comparable oil & gas facilities tracked in United Kingdom.