Overview
Technology: conventional storage.
Ownership: PT PLN Nusantara Power PT.
Why it matters
- The largest hydropower plant in Indonesia by capacity, out of 35 operating hydropower facilities tracked in the country.
- Provides about 18% of Indonesia's operating hydropower capacity and roughly 1% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.5 TWh of electricity a year (indicative estimate).
Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.
Hydropower power in Indonesia
Indonesia has 5.58 GW of operating hydropower capacity across 35 plants in the Global Energy Monitor dataset — 5.8% of the country's total operating power capacity of 96.5 GW.
The hydropower pipeline in Indonesia includes 3.43 GW under construction and 14.5 GW at earlier planning stages.
Other major hydropower plants in Indonesia include Mentarang hydroelectric plant (1.38 GW) and Upper Cisokan hydroelectric plant (1.04 GW).
How hydropower plants work
Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.
Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.
Technology at Cirata hydroelectric plant
Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Location
Cirata hydroelectric plant is located in West Java, Indonesia, at approximately -6.6826, 107.3483. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Cirata hydroelectric plant is owned by PT PLN Nusantara Power PT. Across the dataset, PT PLN Nusantara Power PT is linked to 11 power plants with 9.91 GW of operating capacity.
Frequently asked questions
What is the capacity of Cirata hydroelectric plant?
Cirata hydroelectric plant has a capacity of 1.01 GW according to the latest Global Energy Monitor data.
What type of facility is Cirata hydroelectric plant?
Cirata hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Who owns Cirata hydroelectric plant?
Cirata hydroelectric plant is owned by PT PLN Nusantara Power PT.
Where is Cirata hydroelectric plant located?
It is located in West Java, Indonesia. Approximate coordinates: -6.6826, 107.3483.
Is Cirata hydroelectric plant operational?
According to the latest data, Cirata hydroelectric plant is in operation. Operating means the facility is built and in commercial service.
When did Cirata hydroelectric plant start operating?
Start year: 1986. Current status: Operating.
How much electricity does Cirata hydroelectric plant generate?
Actual output data are not published for every plant. As an indicative estimate, Cirata hydroelectric plant would produce about 3.5 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Cirata hydroelectric plant compared with other facilities in Indonesia?
Cirata hydroelectric plant ranks #1 by capacity among 35 comparable hydropower facilities tracked in Indonesia.