Overview
Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.
One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 1.6 bcm/y of gas.
Ownership: Sakaide LNG.
Why it matters
Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.
LNG terminals in Japan
The dataset tracks 45 lng terminals in Japan, including operating, planned and shelved projects.
Japan has 242.2 mtpa of operating LNG import capacity across 45 terminals.
How lng terminals work
An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.
Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.
Location
Sakaide LNG Terminal is located in Shikoku, Japan, at approximately 34.3568, 133.8367. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Sakaide LNG Terminal is owned by Sakaide LNG.
Frequently asked questions
What is the capacity of Sakaide LNG Terminal?
Sakaide LNG Terminal has a capacity of 1.20 mtpa according to the latest Global Energy Monitor data.
What type of facility is Sakaide LNG Terminal?
Sakaide LNG Terminal is a LNG import (regasification) terminal.
Who owns Sakaide LNG Terminal?
Sakaide LNG Terminal is owned by Sakaide LNG.
Where is Sakaide LNG Terminal located?
It is located in Shikoku, Japan. Approximate coordinates: 34.3568, 133.8367.
Is Sakaide LNG Terminal operational?
According to the latest data, Sakaide LNG Terminal is in operation. Operating means the facility is built and in commercial service.
When did Sakaide LNG Terminal start operating?
Start year: 2010. Current status: Operating.
How big is Sakaide LNG Terminal compared with other facilities in Japan?
Sakaide LNG Terminal ranks #34 by capacity among 45 comparable lng import terminal facilities tracked in Japan.