Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.23 GW, planned 210 MW).
Technology: steam turbine, gas turbine; fuel: natural gas, fossil liquids: fuel oil, natural gas.
Ownership: Zhambyl State District Power Plant JSC (parent company: Tarazenergo-2005).
Its 6 operating units were commissioned between 1967 and 1976. 1 further units or phases are scheduled to come online in 2027.
Why it matters
- The largest oil- and gas-fired power station in Kazakhstan by capacity, out of 22 operating oil & gas facilities tracked in the country.
- Provides about 19% of Kazakhstan's operating oil & gas capacity and roughly 5.2% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 15% for this technology, it would generate roughly 1.6 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Kazakhstan
Kazakhstan has 6.63 GW of operating oil & gas capacity across 22 plants in the Global Energy Monitor dataset — 28% of the country's total operating power capacity of 23.8 GW.
The oil & gas pipeline in Kazakhstan includes 1.33 GW under construction and 4.65 GW at earlier planning stages.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 200 MW | steam turbine | 1967 | ||
| 2 | 200 MW | steam turbine | 1969 | ||
| 3 | 200 MW | steam turbine | 1969 | ||
| 4 | 210 MW | steam turbine | 1976 | ||
| 5 | 210 MW | steam turbine | 1976 | ||
| 6 | 210 MW | steam turbine | 1976 | ||
| 7 | 210 MW | Pre-construction | gas turbine | 2027 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Zhambyl GRES power station
Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Zhambyl GRES power station is located in Zhambyl, Kazakhstan, at approximately 42.8449, 71.4774. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Zhambyl GRES power station is owned by Zhambyl State District Power Plant JSC. The ultimate parent company is Tarazenergo-2005.
Frequently asked questions
What is the capacity of Zhambyl GRES power station?
Zhambyl GRES power station has a capacity of 1.23 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Zhambyl GRES power station?
Zhambyl GRES power station is a oil- and gas-fired power station. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Who owns Zhambyl GRES power station?
Zhambyl GRES power station is owned by Zhambyl State District Power Plant JSC. The ultimate parent company is Tarazenergo-2005.
Where is Zhambyl GRES power station located?
It is located in Zhambyl, Kazakhstan. Approximate coordinates: 42.8449, 71.4774.
Is Zhambyl GRES power station operational?
According to the latest data, Zhambyl GRES power station is in operation. Operating means the facility is built and in commercial service.
When did Zhambyl GRES power station start operating?
Start year: 1967. Current status: Operating. Its 6 operating units were commissioned between 1967 and 1976. 1 further units or phases are scheduled to come online in 2027.
How much electricity does Zhambyl GRES power station generate?
Actual output data are not published for every plant. As an indicative estimate, Zhambyl GRES power station would produce about 1.6 TWh a year, assuming a capacity factor of 15%, which is typical for this technology.
How big is Zhambyl GRES power station compared with other facilities in Kazakhstan?
Zhambyl GRES power station ranks #1 by capacity among 22 comparable oil & gas facilities tracked in Kazakhstan.