Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 1.00 GW, planned 1.10 GW, shelved / mothballed 1.27 GW).
Technology: supercritical; fuel: coal: bituminous.
Ownership: Ekibastuz GRES-2 JSC (parent company: Samruk-Energo JSC; Samruk-Kazyna SWF JSC).
Its 2 operating units were commissioned between 1990 and 1993. 2 further units or phases are scheduled to come online in 2028–2030.
Why it matters
- The 3rd-largest coal-fired power station in Kazakhstan by capacity (of 17 operating coal facilities tracked).
- Provides about 8.4% of Kazakhstan's operating coal capacity and roughly 4.2% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 4.4 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Kazakhstan
Kazakhstan has 11.9 GW of operating coal capacity across 17 plants in the Global Energy Monitor dataset — 50% of the country's total operating power capacity of 23.8 GW.
The coal pipeline in Kazakhstan includes 4.85 GW at earlier planning stages.
Other major coal plants in Kazakhstan include Ekibastuz-1 power station (4.04 GW) and Aksu power station (2.21 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 500 MW | supercritical | 1990 | ||
| Unit 2 | 500 MW | supercritical | 1993 | ||
| Unit 3 | 550 MW | Pre-construction | supercritical | 2028 | |
| Unit 4 | 550 MW | Pre-construction | supercritical | 2030 | |
| Unit 5 | 636 MW | Shelved | supercritical | 2029 | |
| Unit 6 | 636 MW | Shelved | supercritical | 2030 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Ekibastuz-2 power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Location
Ekibastuz-2 power station is located in Pavlodar, Kazakhstan, at approximately 52.0240, 75.4763. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ekibastuz-2 power station is owned by Ekibastuz GRES-2 JSC. The ultimate parent company is Samruk-Energo JSC; Samruk-Kazyna SWF JSC. Across the dataset, Samruk-Energo JSC is linked to 20 power plants with 8.45 GW of operating capacity.
Frequently asked questions
What is the capacity of Ekibastuz-2 power station?
Ekibastuz-2 power station has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Ekibastuz-2 power station?
Ekibastuz-2 power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Ekibastuz-2 power station?
Ekibastuz-2 power station is owned by Ekibastuz GRES-2 JSC. The ultimate parent company is Samruk-Energo JSC; Samruk-Kazyna SWF JSC.
Where is Ekibastuz-2 power station located?
It is located in Pavlodar, Kazakhstan. Approximate coordinates: 52.0240, 75.4763.
Is Ekibastuz-2 power station operational?
According to the latest data, Ekibastuz-2 power station is in operation. Operating means the facility is built and in commercial service.
When did Ekibastuz-2 power station start operating?
Start year: 1990. Current status: Operating. Its 2 operating units were commissioned between 1990 and 1993. 2 further units or phases are scheduled to come online in 2028–2030.
How much electricity does Ekibastuz-2 power station generate?
Actual output data are not published for every plant. As an indicative estimate, Ekibastuz-2 power station would produce about 4.4 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Ekibastuz-2 power station compared with other facilities in Kazakhstan?
Ekibastuz-2 power station ranks #3 by capacity among 17 comparable coal facilities tracked in Kazakhstan.