Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 4.04 GW).
Technology: supercritical; fuel: coal: bituminous.
Ownership: Ekibastuz GRES-1 LLP (parent company: Samruk-Energo JSC).
Its 8 operating units were commissioned between 1980 and 1984.
Why it matters
- The largest coal-fired power station in Kazakhstan by capacity, out of 17 operating coal facilities tracked in the country.
- Provides about 34% of Kazakhstan's operating coal capacity and roughly 17% of all operating power capacity in the country in the dataset.
- Ranks #50 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 18 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Kazakhstan
Kazakhstan has 11.9 GW of operating coal capacity across 17 plants in the Global Energy Monitor dataset — 50% of the country's total operating power capacity of 23.8 GW.
The coal pipeline in Kazakhstan includes 4.85 GW at earlier planning stages.
Other major coal plants in Kazakhstan include Aksu power station (2.21 GW) and Ekibastuz-2 power station (1.00 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 540 MW | supercritical | 1980 | ||
| Unit 2 | 500 MW | supercritical | 1980 | ||
| Unit 3 | 500 MW | supercritical | 1981 | ||
| Unit 4 | 500 MW | supercritical | 1981 | ||
| Unit 5 | 500 MW | supercritical | 1982 | ||
| Unit 6 | 500 MW | supercritical | 1983 | ||
| Unit 7 | 500 MW | supercritical | 1983 | ||
| Unit 8 | 500 MW | supercritical | 1984 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Ekibastuz-1 power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Location
Ekibastuz-1 power station is located in Pavlodar, Kazakhstan, at approximately 51.8861, 75.3769. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ekibastuz-1 power station is owned by Ekibastuz GRES-1 LLP. The ultimate parent company is Samruk-Energo JSC. Across the dataset, Samruk-Energo JSC is linked to 20 power plants with 8.45 GW of operating capacity.
Frequently asked questions
What is the capacity of Ekibastuz-1 power station?
Ekibastuz-1 power station has a capacity of 4.04 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Ekibastuz-1 power station?
Ekibastuz-1 power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Ekibastuz-1 power station?
Ekibastuz-1 power station is owned by Ekibastuz GRES-1 LLP. The ultimate parent company is Samruk-Energo JSC.
Where is Ekibastuz-1 power station located?
It is located in Pavlodar, Kazakhstan. Approximate coordinates: 51.8861, 75.3769.
Is Ekibastuz-1 power station operational?
According to the latest data, Ekibastuz-1 power station is in operation. Operating means the facility is built and in commercial service.
When did Ekibastuz-1 power station start operating?
Start year: 1980. Current status: Operating. Its 8 operating units were commissioned between 1980 and 1984.
How much electricity does Ekibastuz-1 power station generate?
Actual output data are not published for every plant. As an indicative estimate, Ekibastuz-1 power station would produce about 18 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Ekibastuz-1 power station compared with other facilities in Kazakhstan?
Ekibastuz-1 power station ranks #1 by capacity among 17 comparable coal facilities tracked in Kazakhstan.