Nuclear · Japan

Tomari nuclear power plant

Tomari nuclear power plant is a 2.07 GW nuclear power plant located in Hokkaido, Japan. The facility is currently under construction, with a targeted start date of 1989.

2.07 GWCapacity (all phases)
ConstructionStatus
1989Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (under construction 912 MW, shelved / mothballed 1.16 GW).

Technology: pressurized water reactor.

Ownership: Hokkaido Electric Power Co Inc.

1 further units or phases are scheduled to come online in 2027.

Why it matters

  • The 4th-largest nuclear power plant in Japan by capacity (of 12 operating, under-construction and planned nuclear facilities tracked).
  • If completed, it would add 2.07 GW to Japan's nuclear fleet — equivalent to 14% of today's operating nuclear capacity.

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in Japan

Japan has 14.6 GW of operating nuclear capacity across 9 plants in the Global Energy Monitor dataset — 5.8% of the country's total operating power capacity of 253.7 GW.

The nuclear pipeline in Japan includes 4.55 GW under construction.

Other major nuclear plants in Japan include Takahama nuclear power plant (3.39 GW), Genkai nuclear power plant (2.36 GW) and Ohi nuclear power plant (2.36 GW).

See the full list: Nuclear power plants in Japan →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 579 MW Mothballed pressurized water reactor 1989
2 579 MW Mothballed pressurized water reactor 1991
3 912 MW Construction pressurized water reactor 2027

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Tomari nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Tomari nuclear power plant is located in Hokkaido, Japan, at approximately 43.0367, 140.5125. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Tomari nuclear power plant is owned by Hokkaido Electric Power Co Inc. Across the dataset, Hokkaido Electric Power Co Inc is linked to 25 power plants with 6.71 GW of operating capacity.

Frequently asked questions

What is the capacity of Tomari nuclear power plant?

Tomari nuclear power plant has a capacity of 2.07 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Tomari nuclear power plant?

Tomari nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Tomari nuclear power plant?

Tomari nuclear power plant is owned by Hokkaido Electric Power Co Inc.

Where is Tomari nuclear power plant located?

It is located in Hokkaido, Japan. Approximate coordinates: 43.0367, 140.5125.

Is Tomari nuclear power plant operational?

According to the latest data, Tomari nuclear power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Tomari nuclear power plant expected to start?

Start year: 1989. Current status: Construction. 1 further units or phases are scheduled to come online in 2027.

How big is Tomari nuclear power plant compared with other facilities in Japan?

Tomari nuclear power plant ranks #4 by capacity among 12 comparable nuclear facilities tracked in Japan.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects