Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 1.31 GW, under construction 1.32 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: bituminous, coal: unknown.
Ownership: Guoneng (Tianjin) Dagang Power Plant Co Ltd (parent company: China Energy Investment Corp).
Its 4 operating units were commissioned between 1991 and 2005. 2 further units or phases are scheduled to come online in 2025. 4 operating units have a planned retirement date, the earliest in 2027.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.8 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase II Unit 1 | 329 MW | subcritical | 1991 | 2027 | |
| Phase II Unit 2 | 329 MW | subcritical | 1992 | 2027 | |
| Phase IR Unit 1R | 329 MW | subcritical | 2005 | 2027 | |
| Phase IR Unit 2R | 329 MW | subcritical | 2005 | 2027 | |
| Replacement unit 1 | 660 MW | Construction | ultra-supercritical | 2025 | |
| Replacement unit 2 | 660 MW | Construction | ultra-supercritical | 2025 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Tianjin Dagang power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Tianjin Dagang power station is located in Tianjin, China, at approximately 38.7755, 117.4933. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Tianjin Dagang power station is owned by Guoneng (Tianjin) Dagang Power Plant Co Ltd. The ultimate parent company is China Energy Investment Corp. Across the dataset, China Energy Investment Corp is linked to 95 power plants with 96.3 GW of operating capacity.
Frequently asked questions
What is the capacity of Tianjin Dagang power station?
Tianjin Dagang power station has a capacity of 1.31 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Tianjin Dagang power station?
Tianjin Dagang power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Tianjin Dagang power station?
Tianjin Dagang power station is owned by Guoneng (Tianjin) Dagang Power Plant Co Ltd. The ultimate parent company is China Energy Investment Corp.
Where is Tianjin Dagang power station located?
It is located in Tianjin, China. Approximate coordinates: 38.7755, 117.4933.
Is Tianjin Dagang power station operational?
According to the latest data, Tianjin Dagang power station is in operation. Operating means the facility is built and in commercial service.
When did Tianjin Dagang power station start operating?
Start year: 1991. Current status: Operating. Its 4 operating units were commissioned between 1991 and 2005. 2 further units or phases are scheduled to come online in 2025. 4 operating units have a planned retirement date, the earliest in 2027.
How much electricity does Tianjin Dagang power station generate?
Actual output data are not published for every plant. As an indicative estimate, Tianjin Dagang power station would produce about 5.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Tianjin Dagang power station compared with other facilities in China?
Tianjin Dagang power station ranks #361 by capacity among 1188 comparable coal facilities tracked in China.
Nearby energy infrastructure
- Tianjin LNG Terminal (Sinopec)
- Tianjin LNG Terminal (Beijing Gas Group)
- Tianjin Haijing Salt-Light Complementary (Guodian) solar project
- Tianjin Haijing Salt-Light Complementary (Huadian) solar project
- Junliangcheng power station
- Chentangzhuang power station
- Tianjin LNG Terminal (PipeChina)
- Tianjin Haijing Salt-Light Complementary (Huaneng) solar project