LNG import terminal · China

Tianjin LNG Terminal (Beijing Gas Group)

Tianjin LNG Terminal (Beijing Gas Group) is a 5.00 mtpa LNG import (regasification) terminal in Tianjin, China. It is currently in operation, with operations starting in 2023.

5.00 mtpaCapacity
OperatingStatus
2023Start year
View on the interactive map →

Overview

The tracker lists 3 trains, units or expansion phases at the terminal.

Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.

One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 6.8 bcm/y of gas.

Ownership: Beijing Gas Group (Tianjin) Liquefied Natural Gas Co Ltd (parent company: Beijing Gas Group Co Ltd).

Its 3 operating units were commissioned between 2023 and 2024.

Why it matters

  • The 20th-largest LNG import (regasification) terminal in China by capacity (of 32 operating lng import terminal facilities tracked).
  • Ranks #99 worldwide among lng import terminal facilities of the same status group by capacity.

Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.

LNG terminals in China

The dataset tracks 65 lng terminals in China, including operating, planned and shelved projects.

China has 221.0 mtpa of operating LNG import capacity across 32 terminals.

See the full list: LNG terminals in China →

Trains and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Phase 1 5.00 mtpa Operating 2023
Phase 2 Operating 2024
Phase 3 Operating 2024

How lng terminals work

An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.

Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Tianjin LNG Terminal (Beijing Gas Group) is located in Tianjin, China, at approximately 38.7383, 117.7141. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Tianjin LNG Terminal (Beijing Gas Group) is owned by Beijing Gas Group (Tianjin) Liquefied Natural Gas Co Ltd. The ultimate parent company is Beijing Gas Group Co Ltd.

Frequently asked questions

What is the capacity of Tianjin LNG Terminal (Beijing Gas Group)?

Tianjin LNG Terminal (Beijing Gas Group) has a capacity of 5.00 mtpa according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Tianjin LNG Terminal (Beijing Gas Group)?

Tianjin LNG Terminal (Beijing Gas Group) is a LNG import (regasification) terminal.

Who owns Tianjin LNG Terminal (Beijing Gas Group)?

Tianjin LNG Terminal (Beijing Gas Group) is owned by Beijing Gas Group (Tianjin) Liquefied Natural Gas Co Ltd. The ultimate parent company is Beijing Gas Group Co Ltd.

Where is Tianjin LNG Terminal (Beijing Gas Group) located?

It is located in Tianjin, China. Approximate coordinates: 38.7383, 117.7141.

Is Tianjin LNG Terminal (Beijing Gas Group) operational?

According to the latest data, Tianjin LNG Terminal (Beijing Gas Group) is in operation. Operating means the facility is built and in commercial service.

When did Tianjin LNG Terminal (Beijing Gas Group) start operating?

Start year: 2023. Current status: Operating. Its 3 operating units were commissioned between 2023 and 2024.

How big is Tianjin LNG Terminal (Beijing Gas Group) compared with other facilities in China?

Tianjin LNG Terminal (Beijing Gas Group) ranks #20 by capacity among 32 comparable lng import terminal facilities tracked in China.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Gas Infrastructure Tracker, 2025-11 release. Full project profile on GEM.wiki. Last updated: 9 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects