Overview
Global Energy Monitor tracks 21 units or phases at this site (operating 1.78 GW, shelved / mothballed 2.24 GW, retired 450 MW).
Technology: steam turbine, combined cycle; fuel: natural gas, fossil liquids: fuel oil.
Ownership: Tashkent Thermal Power Plant JSC (parent company: Thermal Power Stations JSC).
Its 10 operating units were commissioned between 1963 and 2018. 3 units have already been retired (2023).
Why it matters
- The 4th-largest oil- and gas-fired power station in Uzbekistan by capacity (of 17 operating oil & gas facilities tracked).
- Provides about 11% of Uzbekistan's operating oil & gas capacity and roughly 7.4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 6.2 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Uzbekistan
Uzbekistan has 15.6 GW of operating oil & gas capacity across 17 plants in the Global Energy Monitor dataset — 65% of the country's total operating power capacity of 24.0 GW.
The oil & gas pipeline in Uzbekistan includes 3.68 GW under construction and 200 MW at earlier planning stages.
Other major oil & gas plants in Uzbekistan include Sirdaryo power station (3.20 GW), Talimarjan power station (2.77 GW) and Navoi power station (2.15 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 150 MW | Retired | steam turbine | 1963 | 2023 |
| 1R | 274 MW | Shelved | combined cycle | ||
| 2 | 150 MW | Retired | steam turbine | 1963 | 2023 |
| 3 | 150 MW | Retired | steam turbine | 1963 | 2023 |
| 3R | 274 MW | Shelved | combined cycle | ||
| 4 | 150 MW | steam turbine | 1963 | ||
| 5 | 150 MW | steam turbine | 1963 | ||
| 5R | 274 MW | Shelved | combined cycle | ||
| 6 | 155 MW | steam turbine | 1967 | ||
| 6R | 279 MW | Shelved | combined cycle | ||
| 7 | 165 MW | steam turbine | 1967 | ||
| 7R | 289 MW | Shelved | combined cycle | ||
| 8 | 165 MW | steam turbine | 1967 | ||
| 8R | 289 MW | Shelved | combined cycle | ||
| 9 | 150 MW | steam turbine | 1969 | ||
| 9R | 274 MW | Shelved | combined cycle | ||
| 10 | 165 MW | steam turbine | 1970 | ||
| 10R | 289 MW | Shelved | combined cycle | ||
| 11 | 155 MW | steam turbine | 1970 | ||
| 12 | 155 MW | steam turbine | 1971 | ||
| 13 | 370 MW | combined cycle | 2018 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Tashkent power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Tashkent power station is located in Toshkent Region, Uzbekistan, at approximately 41.3796, 69.3702. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Tashkent power station is owned by Tashkent Thermal Power Plant JSC. The ultimate parent company is Thermal Power Stations JSC. Across the dataset, Thermal Power Stations JSC is linked to 11 power plants in 2 countries, with 12.5 GW of operating capacity.
Frequently asked questions
What is the capacity of Tashkent power station?
Tashkent power station has a capacity of 1.78 GW according to the latest Global Energy Monitor data. This figure covers the 21 units or phases listed for the site.
What type of facility is Tashkent power station?
Tashkent power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Tashkent power station?
Tashkent power station is owned by Tashkent Thermal Power Plant JSC. The ultimate parent company is Thermal Power Stations JSC.
Where is Tashkent power station located?
It is located in Toshkent Region, Uzbekistan. Approximate coordinates: 41.3796, 69.3702.
Is Tashkent power station operational?
According to the latest data, Tashkent power station is in operation. Operating means the facility is built and in commercial service.
When did Tashkent power station start operating?
Start year: 1963. Current status: Operating. Its 10 operating units were commissioned between 1963 and 2018. 3 units have already been retired (2023).
How much electricity does Tashkent power station generate?
Actual output data are not published for every plant. As an indicative estimate, Tashkent power station would produce about 6.2 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Tashkent power station compared with other facilities in Uzbekistan?
Tashkent power station ranks #4 by capacity among 17 comparable oil & gas facilities tracked in Uzbekistan.