Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 2.77 GW).
Technology: combined cycle, steam turbine; fuel: natural gas.
Ownership: Thermal Power Stations JSC.
Its 5 operating units were commissioned between 2004 and 2025.
Why it matters
- The 2nd-largest oil- and gas-fired power station in Uzbekistan by capacity (of 17 operating oil & gas facilities tracked).
- Provides about 18% of Uzbekistan's operating oil & gas capacity and roughly 12% of all operating power capacity in the country in the dataset.
- Ranks #64 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 9.7 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Uzbekistan
Uzbekistan has 15.6 GW of operating oil & gas capacity across 17 plants in the Global Energy Monitor dataset — 65% of the country's total operating power capacity of 24.0 GW.
The oil & gas pipeline in Uzbekistan includes 3.68 GW under construction and 200 MW at earlier planning stages.
Other major oil & gas plants in Uzbekistan include Sirdaryo power station (3.20 GW), Navoi power station (2.15 GW) and Tashkent power station (1.78 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CC1 | 450 MW | combined cycle | 2016 | ||
| CC2 | 450 MW | combined cycle | 2017 | ||
| CC3 | 533 MW | combined cycle | 2025 | ||
| CC4 | 533 MW | combined cycle | 2025 | ||
| ST1 | 800 MW | steam turbine | 2004 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Talimarjan power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Talimarjan power station is located in Qashqadaryo, Uzbekistan, at approximately 38.4812, 65.6298. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Talimarjan power station is owned by Thermal Power Stations JSC. Across the dataset, Thermal Power Stations JSC is linked to 11 power plants in 2 countries, with 12.5 GW of operating capacity.
Frequently asked questions
What is the capacity of Talimarjan power station?
Talimarjan power station has a capacity of 2.77 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Talimarjan power station?
Talimarjan power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Talimarjan power station?
Talimarjan power station is owned by Thermal Power Stations JSC.
Where is Talimarjan power station located?
It is located in Qashqadaryo, Uzbekistan. Approximate coordinates: 38.4812, 65.6298.
Is Talimarjan power station operational?
According to the latest data, Talimarjan power station is in operation. Operating means the facility is built and in commercial service.
When did Talimarjan power station start operating?
Start year: 2004. Current status: Operating. Its 5 operating units were commissioned between 2004 and 2025.
How much electricity does Talimarjan power station generate?
Actual output data are not published for every plant. As an indicative estimate, Talimarjan power station would produce about 9.7 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Talimarjan power station compared with other facilities in Uzbekistan?
Talimarjan power station ranks #2 by capacity among 17 comparable oil & gas facilities tracked in Uzbekistan.