Solar · Saudi Arabia

Sudair Solar PV Project

Sudair Solar PV Project is a 1.50 GW solar power plant located in Riyadh, Saudi Arabia. The facility is currently in operation, with its first unit entering service in 2023.

1.50 GWCapacity
OperatingStatus
2023Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (operating 1.50 GW).

Technology: PV.

Ownership: Saudi Aramco Power Co; Water and Electricity Holding CO (Badeel); ACWA Power Co.

Its 2 operating units were commissioned between 2023 and 2024.

Why it matters

  • The 3rd-largest solar power plant in Saudi Arabia by capacity (of 63 operating solar facilities tracked).
  • Provides about 13% of Saudi Arabia's operating solar capacity and roughly 1.3% of all operating power capacity in the country in the dataset.
  • Ranks #28 worldwide among solar facilities of the same status group by capacity.
  • At a typical capacity factor of 20% for this technology, it would generate roughly 2.6 TWh of electricity a year (indicative estimate).

Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Solar power in Saudi Arabia

Saudi Arabia has 11.6 GW of operating solar capacity across 63 plants in the Global Energy Monitor dataset — 10% of the country's total operating power capacity of 112.6 GW.

The solar pipeline in Saudi Arabia includes 8.02 GW under construction and 23.7 GW at earlier planning stages.

Other major solar plants in Saudi Arabia include NEOM Green Hydrogen solar farm (2.20 GW), Shuaibah 2 solar farm (2.06 GW) and Al-Muwaih Solar PV (2.00 GW).

See the full list: Solar farms in Saudi Arabia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 1.05 GW Operating PV 2023
2 450 MW Operating PV 2024

How solar farms work

Most utility-scale solar plants use photovoltaic (PV) panels that convert sunlight directly into direct current, which inverters turn into alternating current for the grid. A smaller number of concentrated solar power (CSP) plants use mirrors to focus sunlight and heat a fluid that drives a steam turbine.

Solar output follows the daily and seasonal path of the sun, giving typical capacity factors of 15–30% depending on latitude and whether panels track the sun. Its costs have fallen by around 90% over the past decade, making it the fastest-growing power source worldwide; pairing plants with batteries shifts part of their output into the evening peak.

Technology at Sudair Solar PV Project

The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Sudair Solar PV Project is located in Riyadh, Saudi Arabia, at approximately 25.7688, 45.5872. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Sudair Solar PV Project is owned by Saudi Aramco Power Co; Water and Electricity Holding CO (Badeel); ACWA Power Co. Across the dataset, Saudi Aramco Power Co is linked to 14 power plants with 4.17 GW of operating capacity.

Frequently asked questions

What is the capacity of Sudair Solar PV Project?

Sudair Solar PV Project has a capacity of 1.50 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Sudair Solar PV Project?

Sudair Solar PV Project is a solar power plant. The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Who owns Sudair Solar PV Project?

Sudair Solar PV Project is owned by Saudi Aramco Power Co; Water and Electricity Holding CO (Badeel); ACWA Power Co.

Where is Sudair Solar PV Project located?

It is located in Riyadh, Saudi Arabia. Approximate coordinates: 25.7688, 45.5872.

Is Sudair Solar PV Project operational?

According to the latest data, Sudair Solar PV Project is in operation. Operating means the facility is built and in commercial service.

When did Sudair Solar PV Project start operating?

Start year: 2023. Current status: Operating. Its 2 operating units were commissioned between 2023 and 2024.

How much electricity does Sudair Solar PV Project generate?

Actual output data are not published for every plant. As an indicative estimate, Sudair Solar PV Project would produce about 2.6 TWh a year, assuming a capacity factor of 20%, which is typical for this technology.

How big is Sudair Solar PV Project compared with other facilities in Saudi Arabia?

Sudair Solar PV Project ranks #3 by capacity among 63 comparable solar facilities tracked in Saudi Arabia.

Latest news on Sudair Solar PV Project

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.