Oil & gas · Saudi Arabia

Shuqaiq 2 Independent Water and Power Project

Shuqaiq 2 Independent Water and Power Project is a 1.02 GW oil- and gas-fired power station located in Jizan, Saudi Arabia. The facility is currently in operation, with its first unit entering service in 2010.

1.02 GWCapacity
OperatingStatus
2010Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (operating 1.02 GW).

Technology: steam turbine; fuel: heavy fuel oil.

Ownership: Saudi Electricity Co; Gulf Investment Corp; Public Investment Fund (Saudi Arabia); ACWA Power Co; Mitsubishi Corp (parent company: ACWA Power Co; Public Investment Fund (Saudi Arabia); Gulf Investment Corp; Saudi Electricity Co; Mitsubishi Corp).

Why it matters

  • Provides about 1% of Saudi Arabia's operating oil & gas capacity and roughly 0.9% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 3.6 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Saudi Arabia

Saudi Arabia has 100.6 GW of operating oil & gas capacity across 97 plants in the Global Energy Monitor dataset — 89% of the country's total operating power capacity of 112.6 GW.

The oil & gas pipeline in Saudi Arabia includes 14.9 GW under construction and 6.00 GW at earlier planning stages.

Other major oil & gas plants in Saudi Arabia include Rabigh 1 power plant (4.48 GW), Ghazlan power plant (4.26 GW) and Qurayyah CC power plant (4.10 GW).

See the full list: Gas & oil power plants in Saudi Arabia →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 340 MW Operating steam turbine 2010
2 340 MW Operating steam turbine 2010
3 340 MW Operating steam turbine 2010

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Shuqaiq 2 Independent Water and Power Project

Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Shuqaiq 2 Independent Water and Power Project is located in Jizan, Saudi Arabia, at approximately 17.6596, 42.0761. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Shuqaiq 2 Independent Water and Power Project is owned by Saudi Electricity Co; Gulf Investment Corp; Public Investment Fund (Saudi Arabia); ACWA Power Co; Mitsubishi Corp. The ultimate parent company is ACWA Power Co; Public Investment Fund (Saudi Arabia); Gulf Investment Corp; Saudi Electricity Co; Mitsubishi Corp. Across the dataset, ACWA Power Co is linked to 75 power plants in 16 countries, with 40.3 GW of operating capacity.

Frequently asked questions

What is the capacity of Shuqaiq 2 Independent Water and Power Project?

Shuqaiq 2 Independent Water and Power Project has a capacity of 1.02 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Shuqaiq 2 Independent Water and Power Project?

Shuqaiq 2 Independent Water and Power Project is a oil- and gas-fired power station. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.

Who owns Shuqaiq 2 Independent Water and Power Project?

Shuqaiq 2 Independent Water and Power Project is owned by Saudi Electricity Co; Gulf Investment Corp; Public Investment Fund (Saudi Arabia); ACWA Power Co; Mitsubishi Corp. The ultimate parent company is ACWA Power Co; Public Investment Fund (Saudi Arabia); Gulf Investment Corp; Saudi Electricity Co; Mitsubishi Corp.

Where is Shuqaiq 2 Independent Water and Power Project located?

It is located in Jizan, Saudi Arabia. Approximate coordinates: 17.6596, 42.0761.

Is Shuqaiq 2 Independent Water and Power Project operational?

According to the latest data, Shuqaiq 2 Independent Water and Power Project is in operation. Operating means the facility is built and in commercial service.

When did Shuqaiq 2 Independent Water and Power Project start operating?

Start year: 2010. Current status: Operating.

How much electricity does Shuqaiq 2 Independent Water and Power Project generate?

Actual output data are not published for every plant. As an indicative estimate, Shuqaiq 2 Independent Water and Power Project would produce about 3.6 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Shuqaiq 2 Independent Water and Power Project compared with other facilities in Saudi Arabia?

Shuqaiq 2 Independent Water and Power Project ranks #36 by capacity among 97 comparable oil & gas facilities tracked in Saudi Arabia.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects