Coal · Japan

Shin Onoda power station

Shin Onoda power station is a 1.00 GW coal-fired power station located in Yamaguchi, Japan. The facility is currently in operation, with its first unit entering service in 1986.

1.00 GWCapacity
OperatingStatus
1986Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (operating 1.00 GW).

Technology: supercritical; fuel: coal: bituminous.

Ownership: The Chugoku Electric Power Co Inc.

Its 2 operating units were commissioned between 1986 and 1987.

Why it matters

  • The 23rd-largest coal-fired power station in Japan by capacity (of 76 operating coal facilities tracked).
  • Provides about 1.9% of Japan's operating coal capacity.
  • At a typical capacity factor of 50% for this technology, it would generate roughly 4.4 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in Japan

Japan has 52.9 GW of operating coal capacity across 76 plants in the Global Energy Monitor dataset — 21% of the country's total operating power capacity of 253.7 GW.

The coal pipeline in Japan includes 2.95 GW at earlier planning stages.

Other major coal plants in Japan include Hekinan power station (4.10 GW), Kobe power station (2.70 GW) and J-POWER Tachibana-wan power station (2.10 GW).

See the full list: Coal power plants in Japan →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Unit 1 500 MW Operating supercritical 1986
Unit 2 500 MW Operating supercritical 1987

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Shin Onoda power station

Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Shin Onoda power station is located in Yamaguchi, Japan, at approximately 33.9690, 131.1634. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Shin Onoda power station is owned by The Chugoku Electric Power Co Inc. Across the dataset, The Chugoku Electric Power Co Inc is linked to 27 power plants in 3 countries, with 13.5 GW of operating capacity.

Frequently asked questions

What is the capacity of Shin Onoda power station?

Shin Onoda power station has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Shin Onoda power station?

Shin Onoda power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.

Who owns Shin Onoda power station?

Shin Onoda power station is owned by The Chugoku Electric Power Co Inc.

Where is Shin Onoda power station located?

It is located in Yamaguchi, Japan. Approximate coordinates: 33.9690, 131.1634.

Is Shin Onoda power station operational?

According to the latest data, Shin Onoda power station is in operation. Operating means the facility is built and in commercial service.

When did Shin Onoda power station start operating?

Start year: 1986. Current status: Operating. Its 2 operating units were commissioned between 1986 and 1987.

How much electricity does Shin Onoda power station generate?

Actual output data are not published for every plant. As an indicative estimate, Shin Onoda power station would produce about 4.4 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Shin Onoda power station compared with other facilities in Japan?

Shin Onoda power station ranks #23 by capacity among 76 comparable coal facilities tracked in Japan.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects