Overview
Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.
One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 3.1 bcm/y of gas.
Ownership: Chugoku Electric Power.
Why it matters
Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.
LNG terminals in Japan
The dataset tracks 45 lng terminals in Japan, including operating, planned and shelved projects.
Japan has 242.2 mtpa of operating LNG import capacity across 45 terminals.
How lng terminals work
An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.
Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.
Location
Yanai LNG Terminal is located in Chugoku, Japan, at approximately 33.9507, 132.1252. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Yanai LNG Terminal is owned by Chugoku Electric Power. Across the dataset, Chugoku Electric Power is linked to 2 lng terminals.
Frequently asked questions
What is the capacity of Yanai LNG Terminal?
Yanai LNG Terminal has a capacity of 2.30 mtpa according to the latest Global Energy Monitor data.
What type of facility is Yanai LNG Terminal?
Yanai LNG Terminal is a LNG import (regasification) terminal.
Who owns Yanai LNG Terminal?
Yanai LNG Terminal is owned by Chugoku Electric Power.
Where is Yanai LNG Terminal located?
It is located in Chugoku, Japan. Approximate coordinates: 33.9507, 132.1252.
Is Yanai LNG Terminal operational?
According to the latest data, Yanai LNG Terminal is in operation. Operating means the facility is built and in commercial service.
When did Yanai LNG Terminal start operating?
Start year: 1990. Current status: Operating.
How big is Yanai LNG Terminal compared with other facilities in Japan?
Yanai LNG Terminal ranks #26 by capacity among 45 comparable lng import terminal facilities tracked in Japan.