Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.75 GW, under construction 3.98 GW, planned 2.50 GW).
Technology: high temperature gas reactor, pressurized water reactor.
Ownership: Huaneng Nuclear Power Development Co Ltd.
Its 2 operating units were commissioned between 2023 and 2024. 2 further units or phases are scheduled to come online in 2029.
Why it matters
- The 15th-largest nuclear power plant in China by capacity (of 18 operating nuclear facilities tracked).
- Provides about 2.7% of China's operating nuclear capacity.
- At a typical capacity factor of 85% for this technology, it would generate roughly 13 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in China
China has 64.6 GW of operating nuclear capacity across 18 plants in the Global Energy Monitor dataset — 2.1% of the country's total operating power capacity of 3,086.2 GW.
The nuclear pipeline in China includes 51.0 GW under construction and 24.5 GW at earlier planning stages.
Other major nuclear plants in China include Bailong nuclear power plant (8.10 GW), Xudapu nuclear power plant (7.63 GW) and Lianjiang nuclear power plant (7.45 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 211 MW | high temperature gas reactor | 2023 | ||
| 2-1 | 1.53 GW | pressurized water reactor | 2024 | ||
| 2-2 | 1.53 GW | Construction | pressurized water reactor | ||
| 3-1 | 1.23 GW | Construction | pressurized water reactor | 2029 | |
| 3-2 | 1.23 GW | Construction | pressurized water reactor | 2029 | |
| 4-3 | 1.25 GW | Announced | pressurized water reactor | ||
| 4-4 | 1.25 GW | Announced | pressurized water reactor |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Shidao Bay nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Location
Shidao Bay nuclear power plant is located in Shandong, China, at approximately 36.9667, 122.5189. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Shidao Bay nuclear power plant is owned by Huaneng Nuclear Power Development Co Ltd. Across the dataset, Huaneng Nuclear Power Development Co Ltd is linked to 3 power plants with 3.05 GW of operating capacity.
Frequently asked questions
What is the capacity of Shidao Bay nuclear power plant?
Shidao Bay nuclear power plant has a capacity of 1.75 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Shidao Bay nuclear power plant?
Shidao Bay nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Shidao Bay nuclear power plant?
Shidao Bay nuclear power plant is owned by Huaneng Nuclear Power Development Co Ltd.
Where is Shidao Bay nuclear power plant located?
It is located in Shandong, China. Approximate coordinates: 36.9667, 122.5189.
Is Shidao Bay nuclear power plant operational?
According to the latest data, Shidao Bay nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Shidao Bay nuclear power plant start operating?
Start year: 2023. Current status: Operating. Its 2 operating units were commissioned between 2023 and 2024. 2 further units or phases are scheduled to come online in 2029.
How much electricity does Shidao Bay nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Shidao Bay nuclear power plant would produce about 13 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Shidao Bay nuclear power plant compared with other facilities in China?
Shidao Bay nuclear power plant ranks #15 by capacity among 18 comparable nuclear facilities tracked in China.