Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.75 GW, under construction 1.00 GW, planned 200 MW).
Technology: Onshore.
Ownership: Datang International Tuoketuo Power Generation Co Ltd.
Why it matters
- The 7th-largest wind farm in China by capacity (of 4869 operating wind facilities tracked).
- Ranks #9 worldwide among wind facilities of the same status group by capacity.
- At a typical capacity factor of 30% for this technology, it would generate roughly 4.6 TWh of electricity a year (indicative estimate).
Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Wind power in China
China has 542.8 GW of operating wind capacity across 4,869 plants in the Global Energy Monitor dataset — 18% of the country's total operating power capacity of 3,086.2 GW.
The wind pipeline in China includes 214.3 GW under construction and 467.6 GW at earlier planning stages.
Other major wind plants in China include Qinghai Hainan Clean Energy Transmission Base wind farm (6.00 GW), Gansu - Shandong Power Export Huanxian (Huaneng) Wind/Solar Demonstration Project wind farm (4.50 GW) and Xinjiang - Chongqing Power Export wind farms (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Chengguanzhen | 300 MW | Onshore | 2024 | ||
| Heilaotian | 250 MW | Onshore | 2024 | ||
| Jiucaizhuang | 700 MW | Onshore | 2024 | ||
| Phase 2 Horinger | 300 MW | Construction | Onshore | ||
| Phase 2 Qingshuihe | 700 MW | Construction | Onshore | ||
| Phase 2 Togtoh County | 200 MW | Pre-construction | Onshore | ||
| Yangqungou | 500 MW | Onshore | 2024 |
How wind farms work
A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.
Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.
Technology at Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms
This is an onshore wind farm, built on land.
Location
Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms is located in Inner Mongolia, China, at approximately 39.8472, 111.9168. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms is owned by Datang International Tuoketuo Power Generation Co Ltd.
Frequently asked questions
What is the capacity of Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms?
Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms has a capacity of 1.75 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms?
Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms is a wind farm. This is an onshore wind farm, built on land.
Who owns Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms?
Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms is owned by Datang International Tuoketuo Power Generation Co Ltd.
Where is Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms located?
It is located in Inner Mongolia, China. Approximate coordinates: 39.8472, 111.9168.
Is Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms operational?
According to the latest data, Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms is in operation. Operating means the facility is built and in commercial service.
When did Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms start operating?
Start year: 2024. Current status: Operating.
How much electricity does Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms generate?
Actual output data are not published for every plant. As an indicative estimate, Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms would produce about 4.6 TWh a year, assuming a capacity factor of 30%, which is typical for this technology.
How big is Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms compared with other facilities in China?
Inner Mongolia Togtoh Thermal Power Plant Renewable Power Export wind farms ranks #7 by capacity among 4869 comparable wind facilities tracked in China.