Overview
Global Energy Monitor tracks 2 units or phases at this site (under construction 1.32 GW).
Technology: ultra-supercritical; fuel: coal: unknown.
Ownership: Weihai Puyuan Heating Co Ltd (parent company: Weihai Industrial Investment Group Co Ltd; Weihai Lingang Development Group Co Ltd; Weihai Xintai Investment Co Ltd; Weihai Shenglai Investment Co Ltd…).
2 further units or phases are scheduled to come online in 2027.
Why it matters
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 660 MW | Construction | ultra-supercritical | 2027 | |
| Unit 2 | 660 MW | Construction | ultra-supercritical | 2027 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Weihai Puyuan cogen power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Location
Weihai Puyuan cogen power station is located in Shandong, China, at approximately 37.2966, 122.0805. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Weihai Puyuan cogen power station is owned by Weihai Puyuan Heating Co Ltd. The ultimate parent company is Weihai Industrial Investment Group Co Ltd; Weihai Lingang Development Group Co Ltd; Weihai Xintai Investment Co Ltd; Weihai Shenglai Investment Co Ltd; Agricultural Development Bank of China…. Across the dataset, Weihai Industrial Investment Group Co Ltd is linked to 6 power plants with 2.36 GW of operating capacity.
Frequently asked questions
What is the capacity of Weihai Puyuan cogen power station?
Weihai Puyuan cogen power station has a capacity of 1.32 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Weihai Puyuan cogen power station?
Weihai Puyuan cogen power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Weihai Puyuan cogen power station?
Weihai Puyuan cogen power station is owned by Weihai Puyuan Heating Co Ltd. The ultimate parent company is Weihai Industrial Investment Group Co Ltd; Weihai Lingang Development Group Co Ltd; Weihai Xintai Investment Co Ltd; Weihai Shenglai Investment Co Ltd; Agricultural Development Bank of China….
Where is Weihai Puyuan cogen power station located?
It is located in Shandong, China. Approximate coordinates: 37.2966, 122.0805.
Is Weihai Puyuan cogen power station operational?
According to the latest data, Weihai Puyuan cogen power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Weihai Puyuan cogen power station expected to start?
Start year: 2027. Current status: Construction. 2 further units or phases are scheduled to come online in 2027.
How big is Weihai Puyuan cogen power station compared with other facilities in China?
Weihai Puyuan cogen power station ranks #329 by capacity among 1380 comparable coal facilities tracked in China.