Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 1.25 GW, planned 416 MW).
Technology: gas turbine; fuel: natural gas.
Ownership: Sabine Pass Liquefaction LLC (parent company: Cheniere Energy Partners LP).
Its 6 operating units were commissioned between 2016 and 2022. 2 further units or phases are scheduled to come online in 2030–2032.
Why it matters
- At a typical capacity factor of 15% for this technology, it would generate roughly 1.6 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United States
United States has 590.9 GW of operating oil & gas capacity across 1,106 plants in the Global Energy Monitor dataset — 46% of the country's total operating power capacity of 1,280.9 GW.
The oil & gas pipeline in United States includes 29.4 GW under construction and 257.6 GW at earlier planning stages.
Other major oil & gas plants in United States include West County energy center (4.26 GW), Bruce Mansfield power station (3.64 GW) and Crystal River Energy Complex (3.45 GW).
See the full list: Gas & oil power plants in United States →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 208 MW | gas turbine | 2016 | ||
| 2 | 208 MW | gas turbine | 2016 | ||
| 3 | 208 MW | gas turbine | 2017 | ||
| 4 | 208 MW | gas turbine | 2017 | ||
| 5 | 208 MW | gas turbine | 2019 | ||
| 6 | 208 MW | gas turbine | 2022 | ||
| Stage 5 Expansion Project Phase 1 (7) | 208 MW | Pre-construction | gas turbine | 2030 | |
| Stage 5 Expansion Project Phase 1 (8-9) | 208 MW | Pre-construction | gas turbine | 2032 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Sabine Pass LNG Terminal power station
Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
Sabine Pass LNG Terminal power station is located in Louisiana, United States, at approximately 29.7541, -93.8741. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Sabine Pass LNG Terminal power station is owned by Sabine Pass Liquefaction LLC. The ultimate parent company is Cheniere Energy Partners LP.
Frequently asked questions
What is the capacity of Sabine Pass LNG Terminal power station?
Sabine Pass LNG Terminal power station has a capacity of 1.25 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Sabine Pass LNG Terminal power station?
Sabine Pass LNG Terminal power station is a oil- and gas-fired power station. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Who owns Sabine Pass LNG Terminal power station?
Sabine Pass LNG Terminal power station is owned by Sabine Pass Liquefaction LLC. The ultimate parent company is Cheniere Energy Partners LP.
Where is Sabine Pass LNG Terminal power station located?
It is located in Louisiana, United States. Approximate coordinates: 29.7541, -93.8741.
Is Sabine Pass LNG Terminal power station operational?
According to the latest data, Sabine Pass LNG Terminal power station is in operation. Operating means the facility is built and in commercial service.
When did Sabine Pass LNG Terminal power station start operating?
Start year: 2016. Current status: Operating. Its 6 operating units were commissioned between 2016 and 2022. 2 further units or phases are scheduled to come online in 2030–2032.
How much electricity does Sabine Pass LNG Terminal power station generate?
Actual output data are not published for every plant. As an indicative estimate, Sabine Pass LNG Terminal power station would produce about 1.6 TWh a year, assuming a capacity factor of 15%, which is typical for this technology.
How big is Sabine Pass LNG Terminal power station compared with other facilities in United States?
Sabine Pass LNG Terminal power station ranks #97 by capacity among 1106 comparable oil & gas facilities tracked in United States.