Robert H Saunders hydroelectric plant is a 1.05 GW hydropower plant located in Ontario, Canada. The facility is currently in operation, with its first unit entering service in 1958.

1.05 GWCapacity
OperatingStatus
1958Start year
View on the interactive map →

Overview

Technology: run-of-river.

Ownership: Ontario Power Generation Inc.

Why it matters

  • The 21st-largest hydropower plant in Canada by capacity (of 198 operating hydropower facilities tracked).
  • Provides about 1.3% of Canada's operating hydropower capacity and roughly 0.7% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 3.7 TWh of electricity a year (indicative estimate).

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in Canada

Canada has 80.9 GW of operating hydropower capacity across 198 plants in the Global Energy Monitor dataset — 53% of the country's total operating power capacity of 152.6 GW.

The hydropower pipeline in Canada includes 4.72 GW at earlier planning stages.

Other major hydropower plants in Canada include Robert-Bourassa hydroelectric plant (5.62 GW), Churchill Falls hydroelectric plant (5.43 GW) and La Grande 4 hydroelectric plant (2.78 GW).

See the full list: Hydropower plants in Canada →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Robert H Saunders hydroelectric plant

Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Robert H Saunders hydroelectric plant is located in Ontario, Canada, at approximately 45.0088, -74.7905. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Robert H Saunders hydroelectric plant is owned by Ontario Power Generation Inc. Across the dataset, Ontario Power Generation Inc is linked to 49 power plants with 26.3 GW of operating capacity.

Frequently asked questions

What is the capacity of Robert H Saunders hydroelectric plant?

Robert H Saunders hydroelectric plant has a capacity of 1.05 GW according to the latest Global Energy Monitor data.

What type of facility is Robert H Saunders hydroelectric plant?

Robert H Saunders hydroelectric plant is a hydropower plant. Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.

Who owns Robert H Saunders hydroelectric plant?

Robert H Saunders hydroelectric plant is owned by Ontario Power Generation Inc.

Where is Robert H Saunders hydroelectric plant located?

It is located in Ontario, Canada. Approximate coordinates: 45.0088, -74.7905.

Is Robert H Saunders hydroelectric plant operational?

According to the latest data, Robert H Saunders hydroelectric plant is in operation. Operating means the facility is built and in commercial service.

When did Robert H Saunders hydroelectric plant start operating?

Start year: 1958. Current status: Operating.

How much electricity does Robert H Saunders hydroelectric plant generate?

Actual output data are not published for every plant. As an indicative estimate, Robert H Saunders hydroelectric plant would produce about 3.7 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Robert H Saunders hydroelectric plant compared with other facilities in Canada?

Robert H Saunders hydroelectric plant ranks #21 by capacity among 198 comparable hydropower facilities tracked in Canada.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects