Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.32 GW).
Technology: ultra-supercritical, unknown; fuel: coal: unknown.
Ownership: Rural Power Company Ltd; Norinco (parent company: Norinco; Rural Power Company Ltd).
Why it matters
- The largest coal-fired power station in Bangladesh by capacity, out of 7 operating coal facilities tracked in the country.
- Provides about 18% of Bangladesh's operating coal capacity and roughly 4.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.8 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Bangladesh
Bangladesh has 7.23 GW of operating coal capacity across 7 plants in the Global Energy Monitor dataset — 25% of the country's total operating power capacity of 29.4 GW.
The coal pipeline in Bangladesh includes 7.60 GW at earlier planning stages.
Other major coal plants in Bangladesh include Banshkhali power station (S Alam) (1.32 GW), Payra power station (BCPCL) (1.32 GW) and Rampal power station (1.32 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 660 MW | ultra-supercritical | 2025 | ||
| Phase I Unit 2 | 660 MW | ultra-supercritical | 2025 | ||
| Phase II Unit 1 | 660 MW | Cancelled | unknown | 2031 | |
| Phase II Unit 2 | 660 MW | Cancelled | unknown | 2031 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Patuakhali power station (RPCL/NORINCO)
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Location
Patuakhali power station (RPCL/NORINCO) is located in Barisal, Bangladesh, at approximately 22.0251, 90.3123. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Patuakhali power station (RPCL/NORINCO) is owned by Rural Power Company Ltd; Norinco. The ultimate parent company is Norinco; Rural Power Company Ltd. Across the dataset, Norinco is linked to 4 power plants in 4 countries, with 1.62 GW of operating capacity.
Frequently asked questions
What is the capacity of Patuakhali power station (RPCL/NORINCO)?
Patuakhali power station (RPCL/NORINCO) has a capacity of 1.32 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Patuakhali power station (RPCL/NORINCO)?
Patuakhali power station (RPCL/NORINCO) is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Patuakhali power station (RPCL/NORINCO)?
Patuakhali power station (RPCL/NORINCO) is owned by Rural Power Company Ltd; Norinco. The ultimate parent company is Norinco; Rural Power Company Ltd.
Where is Patuakhali power station (RPCL/NORINCO) located?
It is located in Barisal, Bangladesh. Approximate coordinates: 22.0251, 90.3123.
Is Patuakhali power station (RPCL/NORINCO) operational?
According to the latest data, Patuakhali power station (RPCL/NORINCO) is in operation. Operating means the facility is built and in commercial service.
When did Patuakhali power station (RPCL/NORINCO) start operating?
Start year: 2025. Current status: Operating.
How much electricity does Patuakhali power station (RPCL/NORINCO) generate?
Actual output data are not published for every plant. As an indicative estimate, Patuakhali power station (RPCL/NORINCO) would produce about 5.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Patuakhali power station (RPCL/NORINCO) compared with other facilities in Bangladesh?
Patuakhali power station (RPCL/NORINCO) ranks #1 by capacity among 7 comparable coal facilities tracked in Bangladesh.