Overview
Global Energy Monitor tracks 11 units or phases at this site (operating 1.48 GW, planned 2.25 GW, retired 150 MW).
Technology: internal combustion, combined cycle, steam turbine; fuel: natural gas, LNG.
Ownership: Ashuganj Power Station Co Ltd.
Its 6 operating units were commissioned between 1986 and 2017. 4 further units or phases are scheduled to come online in 2028–2041. 1 units have already been retired (2024).
Why it matters
- The largest oil- and gas-fired power station in Bangladesh by capacity, out of 98 operating oil & gas facilities tracked in the country.
- Provides about 7.2% of Bangladesh's operating oil & gas capacity and roughly 5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 5.2 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Bangladesh
Bangladesh has 20.7 GW of operating oil & gas capacity across 98 plants in the Global Energy Monitor dataset — 70% of the country's total operating power capacity of 29.4 GW.
The oil & gas pipeline in Bangladesh includes 1.54 GW under construction and 6.80 GW at earlier planning stages.
Other major oil & gas plants in Bangladesh include Sirajgonj power station (1.09 GW) and Ghorasal power station (1.05 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1-16 | 56 MW | internal combustion | 2011 | ||
| 2-1 | 450 MW | Pre-construction | combined cycle | 2028 | 2053 |
| 2-2 | 600 MW | Announced | combined cycle | 2031 | 2056 |
| 2-3 | 600 MW | Announced | combined cycle | 2037 | 2062 |
| 2-4 | 600 MW | Announced | combined cycle | 2041 | 2066 |
| CC2 | 225 MW | combined cycle | 2015 | ||
| North | 450 MW | combined cycle | 2017 | ||
| South | 450 MW | combined cycle | 2016 | ||
| ST3 | 150 MW | steam turbine | 1986 | ||
| ST4 | 150 MW | steam turbine | 1987 | ||
| ST5 | 150 MW | Retired | steam turbine | 1988 | 2024 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Ashuganj power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Reciprocating engine units are modular and flexible, and are common on islands, in remote grids and for backup supply. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Ashuganj power station is located in Chittagong, Bangladesh, at approximately 24.0433, 91.0143. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ashuganj power station is owned by Ashuganj Power Station Co Ltd. Across the dataset, Ashuganj Power Station Co Ltd is linked to 5 power plants with 1.90 GW of operating capacity.
Frequently asked questions
What is the capacity of Ashuganj power station?
Ashuganj power station has a capacity of 1.48 GW according to the latest Global Energy Monitor data. This figure covers the 11 units or phases listed for the site.
What type of facility is Ashuganj power station?
Ashuganj power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Ashuganj power station?
Ashuganj power station is owned by Ashuganj Power Station Co Ltd.
Where is Ashuganj power station located?
It is located in Chittagong, Bangladesh. Approximate coordinates: 24.0433, 91.0143.
Is Ashuganj power station operational?
According to the latest data, Ashuganj power station is in operation. Operating means the facility is built and in commercial service.
When did Ashuganj power station start operating?
Start year: 1986. Current status: Operating. Its 6 operating units were commissioned between 1986 and 2017. 4 further units or phases are scheduled to come online in 2028–2041. 1 units have already been retired (2024).
How much electricity does Ashuganj power station generate?
Actual output data are not published for every plant. As an indicative estimate, Ashuganj power station would produce about 5.2 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Ashuganj power station compared with other facilities in Bangladesh?
Ashuganj power station ranks #1 by capacity among 98 comparable oil & gas facilities tracked in Bangladesh.