Overview
Global Energy Monitor tracks 10 units or phases at this site (operating 1.05 GW, under construction 356 MW, retired 320 MW).
Technology: steam turbine, combined cycle, gas turbine; fuel: natural gas, LNG.
Ownership: Bangladesh Power Development Board.
Its 4 operating units were commissioned between 1999 and 2022. 2 further units or phases are scheduled to come online in 2026. 3 units have already been retired (2020–2022).
Why it matters
- The 3rd-largest oil- and gas-fired power station in Bangladesh by capacity (of 98 operating oil & gas facilities tracked).
- Provides about 5.1% of Bangladesh's operating oil & gas capacity and roughly 3.6% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.7 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Bangladesh
Bangladesh has 20.7 GW of operating oil & gas capacity across 98 plants in the Global Energy Monitor dataset — 70% of the country's total operating power capacity of 29.4 GW.
The oil & gas pipeline in Bangladesh includes 1.54 GW under construction and 6.80 GW at earlier planning stages.
Other major oil & gas plants in Bangladesh include Ashuganj power station (1.48 GW) and Sirajgonj power station (1.09 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 55 MW | Retired | steam turbine | 1974 | 2020 |
| 2 | 55 MW | Retired | steam turbine | 1976 | 2020 |
| 4 | 210 MW | Retired | steam turbine | 1989 | 2022 |
| 5 | 210 MW | steam turbine | 1999 | ||
| 7 | 365 MW | combined cycle | 2018 | ||
| 8 | 225 MW | Cancelled | combined cycle | ||
| Repowered 3 | 260 MW | gas turbine | 2021 | ||
| Repowered 3 (ST) | 156 MW | Construction | steam turbine | 2026 | |
| Repowered 4 | 210 MW | combined cycle | 2022 | ||
| Repowered 4-New | 200 MW | Construction | combined cycle | 2026 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Ghorasal power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Ghorasal power station is located in Dhaka, Bangladesh, at approximately 23.9801, 90.6371. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ghorasal power station is owned by Bangladesh Power Development Board. Across the dataset, Bangladesh Power Development Board is linked to 36 power plants with 8.37 GW of operating capacity.
Frequently asked questions
What is the capacity of Ghorasal power station?
Ghorasal power station has a capacity of 1.05 GW according to the latest Global Energy Monitor data. This figure covers the 10 units or phases listed for the site.
What type of facility is Ghorasal power station?
Ghorasal power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Ghorasal power station?
Ghorasal power station is owned by Bangladesh Power Development Board.
Where is Ghorasal power station located?
It is located in Dhaka, Bangladesh. Approximate coordinates: 23.9801, 90.6371.
Is Ghorasal power station operational?
According to the latest data, Ghorasal power station is in operation. Operating means the facility is built and in commercial service.
When did Ghorasal power station start operating?
Start year: 1999. Current status: Operating. Its 4 operating units were commissioned between 1999 and 2022. 2 further units or phases are scheduled to come online in 2026. 3 units have already been retired (2020–2022).
How much electricity does Ghorasal power station generate?
Actual output data are not published for every plant. As an indicative estimate, Ghorasal power station would produce about 3.7 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Ghorasal power station compared with other facilities in Bangladesh?
Ghorasal power station ranks #3 by capacity among 98 comparable oil & gas facilities tracked in Bangladesh.