Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.20 GW, planned 1.20 GW).
Technology: ultra-supercritical; fuel: coal: subbituminous.
Ownership: Coal Power Generation Company Bangladesh Ltd.
Its 2 operating units were commissioned between 2023 and 2024. 2 further units or phases are scheduled to come online in 2028.
Why it matters
- The 5th-largest coal-fired power station in Bangladesh by capacity (of 7 operating coal facilities tracked).
- Provides about 17% of Bangladesh's operating coal capacity and roughly 4.1% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Bangladesh
Bangladesh has 7.23 GW of operating coal capacity across 7 plants in the Global Energy Monitor dataset — 25% of the country's total operating power capacity of 29.4 GW.
The coal pipeline in Bangladesh includes 7.60 GW at earlier planning stages.
Other major coal plants in Bangladesh include Banshkhali power station (S Alam) (1.32 GW), Patuakhali power station (RPCL/NORINCO) (1.32 GW) and Payra power station (BCPCL) (1.32 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 600 MW | ultra-supercritical | 2023 | ||
| Phase I Unit 2 | 600 MW | ultra-supercritical | 2024 | ||
| Phase II Unit 1 | 600 MW | Pre-construction | ultra-supercritical | 2028 | |
| Phase II Unit 2 | 600 MW | Pre-construction | ultra-supercritical | 2028 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Matarbari power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Location
Matarbari power station is located in Chittagong, Bangladesh, at approximately 21.7018, 91.8834. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Matarbari power station is owned by Coal Power Generation Company Bangladesh Ltd. Across the dataset, Coal Power Generation Company Bangladesh Ltd is linked to 3 power plants with 1.20 GW of operating capacity.
Frequently asked questions
What is the capacity of Matarbari power station?
Matarbari power station has a capacity of 1.20 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Matarbari power station?
Matarbari power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Matarbari power station?
Matarbari power station is owned by Coal Power Generation Company Bangladesh Ltd.
Where is Matarbari power station located?
It is located in Chittagong, Bangladesh. Approximate coordinates: 21.7018, 91.8834.
Is Matarbari power station operational?
According to the latest data, Matarbari power station is in operation. Operating means the facility is built and in commercial service.
When did Matarbari power station start operating?
Start year: 2023. Current status: Operating. Its 2 operating units were commissioned between 2023 and 2024. 2 further units or phases are scheduled to come online in 2028.
How much electricity does Matarbari power station generate?
Actual output data are not published for every plant. As an indicative estimate, Matarbari power station would produce about 5.3 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Matarbari power station compared with other facilities in Bangladesh?
Matarbari power station ranks #5 by capacity among 7 comparable coal facilities tracked in Bangladesh.