Nuclear · United States

Palisades nuclear power plant

Palisades nuclear power plant is a 1.40 GW nuclear power plant located in Michigan, United States. The facility is currently under construction, with a targeted start date of 1971.

1.40 GWCapacity (all phases)
ConstructionStatus
1971Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (under construction 800 MW, planned 600 MW, retired 850 MW).

Technology: pressurized water reactor, small modular reactor.

Ownership: Holtec International.

3 further units or phases are scheduled to come online in 2026–2030. 1 units have already been retired (2022).

Why it matters

  • If completed, it would add 1.40 GW to United States's nuclear fleet — equivalent to 1.4% of today's operating nuclear capacity.

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in United States

United States has 102.5 GW of operating nuclear capacity across 54 plants in the Global Energy Monitor dataset — 8% of the country's total operating power capacity of 1,280.9 GW.

The nuclear pipeline in United States includes 3.57 GW under construction and 15.9 GW at earlier planning stages.

Other major nuclear plants in United States include Alvin W Vogtle nuclear power plant (4.96 GW), Palo Verde nuclear power plant (4.24 GW) and Browns Ferry nuclear power plant (3.78 GW).

See the full list: Nuclear power plants in United States →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 850 MW Retired pressurized water reactor 1971 2022
2 300 MW Pre-construction small modular reactor 2030
3 300 MW Pre-construction small modular reactor 2030
Unit 1 Repower 800 MW Construction pressurized water reactor 2026

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Palisades nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Palisades nuclear power plant is located in Michigan, United States, at approximately 42.3230, -86.3146. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Palisades nuclear power plant is owned by Holtec International. Across the dataset, Holtec International is linked to 2 power plants.

Frequently asked questions

What is the capacity of Palisades nuclear power plant?

Palisades nuclear power plant has a capacity of 1.40 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Palisades nuclear power plant?

Palisades nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Palisades nuclear power plant?

Palisades nuclear power plant is owned by Holtec International.

Where is Palisades nuclear power plant located?

It is located in Michigan, United States. Approximate coordinates: 42.3230, -86.3146.

Is Palisades nuclear power plant operational?

According to the latest data, Palisades nuclear power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Palisades nuclear power plant expected to start?

Start year: 1971. Current status: Construction. 3 further units or phases are scheduled to come online in 2026–2030. 1 units have already been retired (2022).

How big is Palisades nuclear power plant compared with other facilities in United States?

Palisades nuclear power plant ranks #38 by capacity among 85 comparable nuclear facilities tracked in United States.

Latest news on Palisades nuclear power plant

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects