Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 1.46 GW, under construction 1.29 GW).
Technology: combined cycle, gas turbine; fuel: natural gas, fossil liquids: fuel oil, natural gas.
Ownership: Société Algérienne de Production de l'Electricité SpA (parent company: Sonelgaz SpA).
Its 4 operating units were commissioned between 2016 and 2022.
Why it matters
- The 2nd-largest oil- and gas-fired power station in Algeria by capacity (of 54 operating oil & gas facilities tracked).
- Provides about 5.3% of Algeria's operating oil & gas capacity and roughly 5.1% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 5.1 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Algeria
Algeria has 27.7 GW of operating oil & gas capacity across 54 plants in the Global Energy Monitor dataset — 98% of the country's total operating power capacity of 28.4 GW.
The oil & gas pipeline in Algeria includes 2.22 GW under construction.
Other major oil & gas plants in Algeria include Ras Djinet power plant (1.87 GW), Bellara power station (1.40 GW) and Kais power station (1.27 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1-1 | 500 MW | combined cycle | 2021 | ||
| 1-2 | 500 MW | combined cycle | 2022 | ||
| 2-1 | 228 MW | gas turbine | 2016 | ||
| 2-2 | 228 MW | gas turbine | 2017 | ||
| 3-1 "أوماش 03" | 1.29 GW | Construction | combined cycle |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Oumache power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
Oumache power station is located in Biskra, Algeria, at approximately 34.4410, 5.8893. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Oumache power station is owned by Société Algérienne de Production de l'Electricité SpA. The ultimate parent company is Sonelgaz SpA. Across the dataset, Sonelgaz SpA is linked to 80 power plants with 25.4 GW of operating capacity.
Frequently asked questions
What is the capacity of Oumache power station?
Oumache power station has a capacity of 1.46 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Oumache power station?
Oumache power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Oumache power station?
Oumache power station is owned by Société Algérienne de Production de l'Electricité SpA. The ultimate parent company is Sonelgaz SpA.
Where is Oumache power station located?
It is located in Biskra, Algeria. Approximate coordinates: 34.4410, 5.8893.
Is Oumache power station operational?
According to the latest data, Oumache power station is in operation. Operating means the facility is built and in commercial service.
When did Oumache power station start operating?
Start year: 2016. Current status: Operating. Its 4 operating units were commissioned between 2016 and 2022.
How much electricity does Oumache power station generate?
Actual output data are not published for every plant. As an indicative estimate, Oumache power station would produce about 5.1 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Oumache power station compared with other facilities in Algeria?
Oumache power station ranks #2 by capacity among 54 comparable oil & gas facilities tracked in Algeria.