Oil & gas · Israel

Orot Rabin power station

Orot Rabin power station is a 3.91 GW oil- and gas-fired power station located in H̱efa, Israel. The facility is currently in operation, with its first unit entering service in 1981.

3.91 GWCapacity
OperatingStatus
1981Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 10 units or phases at this site (operating 3.91 GW, under construction 1.15 GW).

Technology: combined cycle, subcritical, steam turbine; fuel: natural gas, coal: bituminous.

Ownership: Israel Electric Corp Ltd (parent company: Government of Israel; unknown).

Its 8 operating units were commissioned between 1981 and 2024. 2 further units or phases are scheduled to come online in 2026–2027. 6 operating units have a planned retirement date, the earliest in 2026.

Why it matters

  • The largest oil- and gas-fired power station in Israel by capacity, out of 28 operating oil & gas facilities tracked in the country.
  • Provides about 23% of Israel's operating oil & gas capacity and roughly 19% of all operating power capacity in the country in the dataset.
  • Ranks #20 worldwide among oil & gas facilities of the same status group by capacity.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 14 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Israel

Israel has 16.7 GW of operating oil & gas capacity across 28 plants in the Global Energy Monitor dataset — 82% of the country's total operating power capacity of 20.4 GW.

The oil & gas pipeline in Israel includes 3.70 GW under construction and 2.40 GW at earlier planning stages.

Other major oil & gas plants in Israel include Eshkol power station (1.68 GW), Hagit power station (1.40 GW) and Sorek PPP power station (1.40 GW).

See the full list: Gas & oil power plants in Israel →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
CC1 630 MW Operating combined cycle 2024
CC2 630 MW Operating combined cycle 2024
Unit 1 375 MW Operating subcritical 1982 2028
Unit 2 375 MW Operating subcritical 1981 2028
Unit 3 375 MW Operating subcritical 1983 2028
Unit 4 375 MW Operating subcritical 1984 2028
Unit 5, timepoint 1 575 MW Operating subcritical 1995 2026
Unit 5, timepoint 2 575 MW Construction steam turbine 2026
Unit 6, timepoint 1 575 MW Operating subcritical 1996 2026
Unit 6, timepoint 2 575 MW Construction steam turbine 2027

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Orot Rabin power station

Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Orot Rabin power station is located in H̱efa, Israel, at approximately 32.4699, 34.8863. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Orot Rabin power station is owned by Israel Electric Corp Ltd. The ultimate parent company is Government of Israel; unknown. Across the dataset, Government of Israel is linked to 9 power plants with 8.27 GW of operating capacity.

Frequently asked questions

What is the capacity of Orot Rabin power station?

Orot Rabin power station has a capacity of 3.91 GW according to the latest Global Energy Monitor data. This figure covers the 10 units or phases listed for the site.

What type of facility is Orot Rabin power station?

Orot Rabin power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Who owns Orot Rabin power station?

Orot Rabin power station is owned by Israel Electric Corp Ltd. The ultimate parent company is Government of Israel; unknown.

Where is Orot Rabin power station located?

It is located in H̱efa, Israel. Approximate coordinates: 32.4699, 34.8863.

Is Orot Rabin power station operational?

According to the latest data, Orot Rabin power station is in operation. Operating means the facility is built and in commercial service.

When did Orot Rabin power station start operating?

Start year: 1981. Current status: Operating. Its 8 operating units were commissioned between 1981 and 2024. 2 further units or phases are scheduled to come online in 2026–2027. 6 operating units have a planned retirement date, the earliest in 2026.

How much electricity does Orot Rabin power station generate?

Actual output data are not published for every plant. As an indicative estimate, Orot Rabin power station would produce about 14 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Orot Rabin power station compared with other facilities in Israel?

Orot Rabin power station ranks #1 by capacity among 28 comparable oil & gas facilities tracked in Israel.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects