Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 2.40 GW).
Technology: supercritical; fuel: coal: unknown.
Ownership: NTPC Ltd.
Its 3 operating units were commissioned between 2016 and 2018.
Why it matters
- The 18th-largest coal-fired power station in India by capacity (of 285 operating coal facilities tracked).
- At a typical capacity factor of 50% for this technology, it would generate roughly 11 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 800 MW | supercritical | 2016 | ||
| Unit 2 | 800 MW | supercritical | 2017 | ||
| Unit 3 | 800 MW | supercritical | 2018 | ||
| Unit 4 | 800 MW | Cancelled | supercritical | ||
| Unit 5 | 800 MW | Cancelled | supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Kudgi Super Thermal Power Project
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Location
Kudgi Super Thermal Power Project is located in Karnataka, India, at approximately 16.4995, 75.8346. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Kudgi Super Thermal Power Project is owned by NTPC Ltd. Across the dataset, NTPC Ltd is linked to 109 power plants in 4 countries, with 80.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Kudgi Super Thermal Power Project?
Kudgi Super Thermal Power Project has a capacity of 2.40 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Kudgi Super Thermal Power Project?
Kudgi Super Thermal Power Project is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Kudgi Super Thermal Power Project?
Kudgi Super Thermal Power Project is owned by NTPC Ltd.
Where is Kudgi Super Thermal Power Project located?
It is located in Karnataka, India. Approximate coordinates: 16.4995, 75.8346.
Is Kudgi Super Thermal Power Project operational?
According to the latest data, Kudgi Super Thermal Power Project is in operation. Operating means the facility is built and in commercial service.
When did Kudgi Super Thermal Power Project start operating?
Start year: 2016. Current status: Operating. Its 3 operating units were commissioned between 2016 and 2018.
How much electricity does Kudgi Super Thermal Power Project generate?
Actual output data are not published for every plant. As an indicative estimate, Kudgi Super Thermal Power Project would produce about 11 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Kudgi Super Thermal Power Project compared with other facilities in India?
Kudgi Super Thermal Power Project ranks #18 by capacity among 285 comparable coal facilities tracked in India.