Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.36 GW, under construction 1.36 GW, shelved / mothballed 5.50 GW).
Technology: boiling water reactor.
Ownership: Tokyo Electric Power Co.
1 further units or phases are scheduled to come online in 2030.
Why it matters
- The 5th-largest nuclear power plant in Japan by capacity (of 9 operating nuclear facilities tracked).
- Provides about 9.3% of Japan's operating nuclear capacity and roughly 0.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 85% for this technology, it would generate roughly 10 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Japan
Japan has 14.6 GW of operating nuclear capacity across 9 plants in the Global Energy Monitor dataset — 5.8% of the country's total operating power capacity of 253.7 GW.
The nuclear pipeline in Japan includes 4.55 GW under construction.
Other major nuclear plants in Japan include Takahama nuclear power plant (3.39 GW), Genkai nuclear power plant (2.36 GW) and Ohi nuclear power plant (2.36 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 1.10 GW | Mothballed | boiling water reactor | 1985 | |
| 2 | 1.10 GW | Mothballed | boiling water reactor | 1990 | |
| 3 | 1.10 GW | Mothballed | boiling water reactor | 1993 | |
| 4 | 1.10 GW | Mothballed | boiling water reactor | 1994 | |
| 5 | 1.10 GW | Mothballed | boiling water reactor | 1990 | |
| 6 | 1.36 GW | boiling water reactor | 2026 | ||
| 7 | 1.36 GW | Construction | boiling water reactor | 2030 |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Kashiwazaki Kariwa nuclear power plant
Boiling water reactors (BWR) boil water directly in the reactor core and send the steam straight to the turbine.
Location
Kashiwazaki Kariwa nuclear power plant is located in Niigata, Japan, at approximately 37.4259, 138.5941. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Kashiwazaki Kariwa nuclear power plant is owned by Tokyo Electric Power Co. Across the dataset, Tokyo Electric Power Co is linked to 79 power plants in 10 countries, with 88.4 GW of operating capacity.
Frequently asked questions
What is the capacity of Kashiwazaki Kariwa nuclear power plant?
Kashiwazaki Kariwa nuclear power plant has a capacity of 1.36 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Kashiwazaki Kariwa nuclear power plant?
Kashiwazaki Kariwa nuclear power plant is a nuclear power plant. Boiling water reactors (BWR) boil water directly in the reactor core and send the steam straight to the turbine.
Who owns Kashiwazaki Kariwa nuclear power plant?
Kashiwazaki Kariwa nuclear power plant is owned by Tokyo Electric Power Co.
Where is Kashiwazaki Kariwa nuclear power plant located?
It is located in Niigata, Japan. Approximate coordinates: 37.4259, 138.5941.
Is Kashiwazaki Kariwa nuclear power plant operational?
According to the latest data, Kashiwazaki Kariwa nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Kashiwazaki Kariwa nuclear power plant start operating?
Start year: 2026. Current status: Operating. 1 further units or phases are scheduled to come online in 2030.
How much electricity does Kashiwazaki Kariwa nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Kashiwazaki Kariwa nuclear power plant would produce about 10 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Kashiwazaki Kariwa nuclear power plant compared with other facilities in Japan?
Kashiwazaki Kariwa nuclear power plant ranks #5 by capacity among 9 comparable nuclear facilities tracked in Japan.